Feasibility Study & Detail Designs of 8 (Eight ) Water Supply & Sanitation schemes from existing Boreholes .
Acheteur: Afar Region RPCU
Montant non publié
Ouvert
Date limite: 20 nov. 2026
Cet avis n’accepte plus d’offres. L’original reste disponible à titre de référence.
| Attributaire / titulaire | Numéro d’immatriculation / LEI | Pays | Montant du contrat attribué | Date d’attribution |
|---|---|---|---|---|
| BD CONSTRUCTION ENGINEERING Holleta Town, Ethiopia | WB-VENDOR: 824761 | Éthiopie | 4 195 523,84 ETB | 3 juin 2026 |
Vérifié:
L’avis officiel fait foi. Son statut et ses conditions peuvent évoluer après la collecte.
Contract Award Project: P178566-Food Systems Resilience Program for Eastern and Southern Africa Loan/Credit/TF Info: IDA-71560 Bid/Contract Reference No: ET-OROMIA SHAGAR WOR-FSRP-517107-CW-RFQ Procurement Method: RFQ-Request for Quotations Scope of Contract: Lot 1. Construction works for the Vermi Culture Center in Geda Faji Woreda, Shegger City. Notice Version No: 0 Date Notification of Award Issued (YYYY/MM/DD) 2026/06/03 Duration of Contract 90 Day(s) Awarded Bidder(s): BD CONSTRUCTION ENGINEERING (824761) Holleta Town, Ethiopia Country: Ethiopia Bid Price at Opening ETB 4195523.84 Evaluated Bid Price ETB 4195523.84 Signed Contract price ETB 4195523.84 Evaluated Bidder(s): AKIMU CONSTRUCTION AND ENGINEERING (560340) Oromia Region, Ethiopia Country: Ethiopia Bid Price at Opening ETB 4719845.13 Evaluated Bid Price ETB 4719845.13 ASSEFA KEBEDE GC (1107187) OROMIA REGION, ETHIOPIA Country: Ethiopia Bid Price at Opening ETB 6341605.08 Evaluated Bid Price ETB 6341605.08
Acheteur: Afar Region RPCU
Montant non publié
Ouvert
Date limite: 20 nov. 2026
Acheteur: Cross River State SPIN
Montant non publié
Ouvert
Date limite: 30 nov. 2026
Acheteur: Project Management Unit, School Education Department, Government of Balochistan
Montant non publié
Ouvert
Date limite: 23 nov. 2026
Acheteur: Project Management Unit, School Education Department, Government of Balochistan
Montant non publié
Ouvert
Date limite: 24 nov. 2026
Acheteur: Amhara Urban Development and Infrastructure Bureau
Montant non publié
Ouvert
Date limite: 18 nov. 2026