Feasibility Study & Detail Designs of 8 (Eight ) Water Supply & Sanitation schemes from existing Boreholes .
Acheteur: Afar Region RPCU
Montant non publié
Ouvert
Date limite: 20 nov. 2026
Cet avis n’accepte plus d’offres. L’original reste disponible à titre de référence.
Vérifié:
L’avis officiel fait foi. Son statut et ses conditions peuvent évoluer après la collecte.
This project involves the procurement and supply of Original Equipment (OE) Mercedes vehicle parts to support the maintenance, repair, and operational requirements of the fleet. The contract will ensure the availability of genuine Mercedes components manufactured to original equipment specifications, maintaining vehicle safety, reliability, performance, and warranty compliance. The appointed supplier will provide a comprehensive range of OE parts, supported by efficient ordering, stock availability, and delivery services, to minimise vehicle downtime and support the effective operation of fleet vehicles.
Acheteur: Afar Region RPCU
Montant non publié
Ouvert
Date limite: 20 nov. 2026
Acheteur: Cross River State SPIN
Montant non publié
Ouvert
Date limite: 30 nov. 2026
Acheteur: Project Management Unit, School Education Department, Government of Balochistan
Montant non publié
Ouvert
Date limite: 23 nov. 2026
Acheteur: Project Management Unit, School Education Department, Government of Balochistan
Montant non publié
Ouvert
Date limite: 24 nov. 2026
Acheteur: Amhara Urban Development and Infrastructure Bureau
Montant non publié
Ouvert
Date limite: 18 nov. 2026