Feasibility Study & Detail Designs of 8 (Eight ) Water Supply & Sanitation schemes from existing Boreholes .
Acheteur: Afar Region RPCU
Montant non publié
Ouvert
Date limite: 20 nov. 2026
Cet avis n’accepte plus d’offres. L’original reste disponible à titre de référence.
Vérifié:
L’avis officiel fait foi. Son statut et ses conditions peuvent évoluer après la collecte.
The Northern Ireland Authority for Utility Regulation (UR) requires a Supplier to develop, implement and manage the delivery of a project plan for Phase 1 (only) of the Customer Care Register project. This phase will see the development and implementation of a joint electricity and gas CCR (referred to as the ‘energy CCR’). The energy CCR will be a two-tiered register with a medical tier (for those reliant on electricity for healthcare needs and those with a terminal illness) and a needs-based tier. The water CCR will remain as a single tiered CCR during Phase 1 and needs-based recording will not be introduced for water during this phase. Further details on requirements are outlined in the Specification document.
Acheteur: Afar Region RPCU
Montant non publié
Ouvert
Date limite: 20 nov. 2026
Acheteur: Cross River State SPIN
Montant non publié
Ouvert
Date limite: 30 nov. 2026
Acheteur: Project Management Unit, School Education Department, Government of Balochistan
Montant non publié
Ouvert
Date limite: 23 nov. 2026
Acheteur: Project Management Unit, School Education Department, Government of Balochistan
Montant non publié
Ouvert
Date limite: 24 nov. 2026
Acheteur: Amhara Urban Development and Infrastructure Bureau
Montant non publié
Ouvert
Date limite: 18 nov. 2026