Feasibility Study & Detail Designs of 8 (Eight ) Water Supply & Sanitation schemes from existing Boreholes .
Acheteur: Afar Region RPCU
Montant non publié
Ouvert
Date limite: 20 nov. 2026
Cet avis n’accepte plus d’offres. L’original reste disponible à titre de référence.
Vérifié:
L’avis officiel fait foi. Son statut et ses conditions peuvent évoluer après la collecte.
A key objective of the project is to remove the last remaining asbestos from our Oban Depot. It’s believed that there is asbestos under the parapet coping stones. These large coping stones have to be carefully lifted to remove the asbestos from the underside. A full asbestos demolition survey is to be carried out at project commencement to identify all asbestos containing materials. The stone copes will be reset in their previous locations.
The existing roofing screed is to be fully stripped. Any defects to the existing substrate shall be repaired as necessary. A new waterproof/ non-slip coating will be applied over the substrate.
A new handrail is to be fabricated and installed around the inside face of the parapet.
A new aluminium step structure is to be fabricated and installed to allow access from the external kitchen door down on to the roof space.
Acheteur: Afar Region RPCU
Montant non publié
Ouvert
Date limite: 20 nov. 2026
Acheteur: Cross River State SPIN
Montant non publié
Ouvert
Date limite: 30 nov. 2026
Acheteur: Project Management Unit, School Education Department, Government of Balochistan
Montant non publié
Ouvert
Date limite: 23 nov. 2026
Acheteur: Project Management Unit, School Education Department, Government of Balochistan
Montant non publié
Ouvert
Date limite: 24 nov. 2026
Acheteur: Amhara Urban Development and Infrastructure Bureau
Montant non publié
Ouvert
Date limite: 18 nov. 2026