Hungary – Parts of engines or motors – Gépek,eszközök alkatrészellátás,szerviz beszerzése
Buyer: Állampusztai Mezőgazdasági és Kereskedelmi Kft.
Value not published
Open
Submission deadline: Dec 21, 2026, 11:00 AM UTC
| Status | Awarded |
|---|---|
| Estimated value | €133,350,000 |
| Submission deadline | Deadline not published |
| Published | Nov 13, 2026 |
| Buyer | The European Joint Undertaking for ITER and the Development of Fusion Energy ('Fusion for Energy') |
| Country | Spain · Barcelona |
| CPV code | 42150000, 42000000, 31630000 |
| Source | Tenders Electronic Daily (TED) ↗ |
This notice is no longer open for submissions. The original remains available for reference.
| Awarded supplier / winner | Registration / LEI number | Country | Awarded contract amount | Award date |
|---|---|---|---|---|
| ASTURFEITO S.A. Parque Empresarial Principado de Asturias, Avilés, 33417 | ES-REG: A33344078 | Spain | €133,350,000 | Nov 13, 2026 |
| DE PRETTO INDUSTRIE S.R.L. Via A. Fogazzaro, 5, Schio, 36015 | IT-REG: 00501150247 | Italy | €133,350,000 | Nov 13, 2026 |
| SIMIC S.P.A Via Vittorio Veneto, Camerana, 12072 | IT-REG: 02121640045 | Italy | €133,350,000 | Nov 13, 2026 |
| ASG SUPERCONDUCTORS S.P.A. Corso Perrone 73 R., Genova, 16152 | IT-REG: 01282370095 | Italy | €133,350,000 | Nov 13, 2026 |
Buyer: Állampusztai Mezőgazdasági és Kereskedelmi Kft.
Value not published
Open
Submission deadline: Dec 21, 2026, 11:00 AM UTC
Buyer: Spółka Restrukturyzacji Kopalń S.A.
Value not published
Open
Submission deadline: Nov 27, 2026, 07:00 AM UTC
Buyer: ΔΗΜΟΣ ΚΟΜΟΤΗΝΗΣ
€572,500
Open
Submission deadline: Dec 28, 2026, 12:00 PM UTC
Buyer: Universitätsklinikum Magdeburg A.ö.R.
Value not published
Open
Submission deadline: Dec 21, 2026, 09:00 AM UTC
Checked:
The original notice takes precedence. Its status and conditions can change after collection.
Supply of Neutral Beam Magnetic Shielding units (expected 2 units, up to a maximum of 3 units). Each system includes 9 resistive magnets and a passive shield composed by iron and carbon steel plates. Supply is based on build to print specification and include manufacturing design, procurement, manufacturing, factory assembly and testing, documentation and shipping to ITER. Typical coil dimension 4mx4m, 3 tons of copper conductor. Overall dimension of one shield is 15m x 5m x 5m, with a mass of 600 tons. Part of the passive shield has also nuclear safety function, being support of the Neutral Beam Vessel, and shall be manufactured according to RCCMR 2007 (support section). Material shall follow ITER requirement on impurities.
Supply of Neutral Beam Magnetic Shielding units (expected 2 units, up to a maximum of 3 units). Each system includes 9 resistive magnets and a passive shield composed by iron and carbon steel plates. Supply is based on build to print specification and include manufacturing design, procurement, manufacturing, factory assembly and testing, documentation and shipping to ITER. Typical coil dimension 4mx4m, 3 tons of copper conductor. Overall dimension of one shield is 15m x 5m x 5m, with a mass of 600 tons. Part of the passive shield has also nuclear safety function, being support of the Neutral Beam Vessel, and shall be manufactured according to RCCMR 2007 (support section). Material shall follow ITER requirement on impurities.