SprosRadar
Find tenders
Tenders Electronic Daily (TED) · 787934-2026

Overhaul of English Electric/GEC EA2 power turbines

Key facts

StatusCheck source
Estimated valueValue not published
Submission deadlineDeadline not published
PublishedNov 12, 2026
BuyerFingrid Oyj
CountryFinland · Helsinki
CPV code50531000
SourceTenders Electronic Daily (TED) ↗
Open official notice
Status
Check source
Estimated value
Value not published
Submission deadline
Deadline not published
Published
Nov 12, 2026
Buyer
Fingrid Oyj
Country
Finland
CPV code
50531000
Source
Tenders Electronic Daily (TED)

Checked:

The original notice takes precedence. Its status and conditions can change after collection.

Description

This procurement consists of overhaul of one (1) English Electric/GEC EA2 power turbine. The overhaul of Huutokoski unit 5 will take place in 2027. In addition to this, overhaul of four (4) English Electric/GEC EA2 power turbines, shall be quoted as mandatory options 1, 2, 3 and 4 (“Options”). The schedule for executing these options shall be decided later, but are preliminarily planned for years 2028 - 2031. The preliminary scope of supply for Huutokoski unit 5 overhaul consists of: 1) Disassembly of the power turbine to a level in which the rotor discs and stator vanes are removed from the unit 2) Inspection of all relevant parts, components and assemblies. Measurement and record of relevant clearances and dimensions 3) Supply and replacement of all consumables and one life components 4) Supply and replacement of all other potentially required spare parts 5) Repair of any damaged parts, components and assemblies 6) Reassembly of the unit 7) Commissioning The same scope of supply shall be quoted for the Options.

Lots

  1. Overhaul of English Electric/GEC EA2 power turbines

    This procurement consists of overhaul of one (1) English Electric/GEC EA2 power turbine. The overhaul of Huutokoski unit 5 will take place in 2027. In addition to this, overhaul of four (4) English Electric/GEC EA2 power turbines, shall be quoted as mandatory options 1, 2, 3 and 4 (“Options”). The schedule for executing these options shall be decided later, but are preliminarily planned for years 2028 - 2031. The preliminary scope of supply for Huutokoski unit 5 overhaul consists of: 1) Disassembly of the power turbine to a level in which the rotor discs and stator vanes are removed from the unit 2) Inspection of all relevant parts, components and assemblies. Measurement and record of relevant clearances and dimensions 3) Supply and replacement of all consumables and one life components 4) Supply and replacement of all other potentially required spare parts 5) Repair of any damaged parts, components and assemblies 6) Reassembly of the unit 7) Commissioning The same scope of supply shall be quoted for the Options.