Operation and Maintenance of Hebburn and VENJ Heat Networks

Key facts

StatusAwarded
Estimated value£321,605
Submission deadlineDeadline not published
PublishedNov 26, 2026
BuyerSouth Tyneside Borough Council
CountryUnited Kingdom · South Shields
CPV code50720000, 09323000
SourceFind a Tender ↗
Open official notice

Buyer competition & track record

View buyer →
Collected notices20 open
Confirmed contracts2Top winners by contract awards: CRITIQOM LIMITED
Single-bidder rate0%Median bids per tender: 3 · n=1

Contract outcome & evergreen alternatives

This notice is no longer open for submissions. The original remains available for reference.

Awarded supplier / winnerRegistration / LEI numberCountryAwarded contract amountAward date
Veolia Energy & Utility Services UK Limited
London
GB-COH: 02585759United Kingdom£321,605Nov 17, 2026

Open tenders in this CPV category (CPV 50000000 · View CPV × country award matrix)

Check eligibility, thresholds & deadlines

Checked:

The original notice takes precedence. Its status and conditions can change after collection.

Description

South Tyneside Council is appointing an operation & maintenance contractor for two heat networks in Jarrow (VENJ) and Hebburn Renewable Energy Network that were completed in September 2023.

Lots

  1. 1

    VENJ
    The VENJ network currently feeds 9 Council buildings (3 with 44 flats each) with heat via buried pipework and 5 with private wire electricity via HV link. The energy centre comprises a 700kWth ammonia river source heat pump with river abstraction filters and pumps, 2 no. 850kW Hoval gas boilers, 43kWe CHP, 4 heating pumps, associated DH water treatment, 100m3 thermal storage & 90 no. (225m2) solar thermal system. System temperatures are 75/55 by design and 73/58 in practice. Hydraulic separation to buildings is provided by Danfoss heat exchange skids with ECL310 controllers & Kamstrup 603 heat meters networked back to the energy centre BMS over fibre. Electrical equipment includes HV switchgear, 2MVA HV/LV transformer, 1MW Solar PV farm and a containerised 500kWh, 200kW LiOn battery. There is scope to expand heat supply to 20 buildings in future phases. The energy centre is an industrial profiled steel building on a brownfield site off Blackett St. Current annual heat load is approx. 2.6MWh p.a.
    Hebburn Renewable Energy Network
    Hebburn Renewable Energy Network supplies heat via buried pipework to Durham Court (111 flats), Hebburn Central leisure centre, a children's home and other buildings in development. The energy centre is an architectural design adjacent to Mountbatten shopping centre. Main heat source is a 500kW cascade heat pump forming primary heat supply at 75/65'C drawing from fan coil units on the roof. Secondary heat is provided by 3 no. Hoval boilers located in the adjacent leisure centre, Hebburn Central, and 125kWe CHP. There are two sets of DH pumps and associated water treatment and pressurisation units. Hydraulic separation from Durham Court is plate heat exchangers, effectively the network primary is part of Hebburn Central LTHW system. Metering is by Kamstrup 603 series. LV electricity is drawn from Hebburn Central via private wire. Annual heat demand is approx. 2MWh p.a.