Installation of new dust LEV in Coxon F0.28

Key facts

StatusAwarded
Estimated value£37,514.75
Submission deadlineDeadline not published
PublishedNov 20, 2026
BuyerCENTRE FOR PROCESS INNOVATION LIMITED
CountryUnited Kingdom · Redcar
CPV code71315410, 45331210
SourceFind a Tender ↗
Open official notice

Buyer competition & track record

View buyer →
Collected notices110 open
Confirmed contracts11Top winners by contract awards: Expervent Limited
Single-bidder rate0%Median bids per tender: 4 · n=2
Top-3 winner concentration36.4%Top-1: 18.2% · n=11

Contract outcome & evergreen alternatives

This notice is no longer open for submissions. The original remains available for reference.

Awarded supplier / winnerRegistration / LEI numberCountryAwarded contract amountAward date
Expervent Limited
Blackett Street, Jarrow, NE32 3QS
p.matthewson@expervent.com · 01914895400
GB-COH: 09130183United Kingdom£37,514.75Nov 19, 2026

Open tenders in this CPV category (CPV 71000000 · View CPV × country award matrix)

Check eligibility, thresholds & deadlines

Checked:

The original notice takes precedence. Its status and conditions can change after collection.

Description

As part of a previous Lab Refurbishment programme, a dust extraction system was installed in Coxon’s F0.28 laboratory in 2025. When commissioning connected equipment to the installed dust extract system, a loss of LFP powder was realised into the extract duct, which coincided with an over pressurisation of the duct from a connected vac pump causing LFP powder to exit at several joints contaminating the laboratory environment.
At this time, CPI had separately engaged a 3rd party consultant, Mechon Limited, for a wider review of extract systems across CPI’s estate. Following the loss of containment, Mechon were engaged to expedite the review the affected Laboratories as a matter of priority.
This review has resulted in a detailed specification of work and design package being produced. The provided Mechon Design and Specification is to be ultimately referenced and is required to correct the loss of containment and return F028 and F029 laboratories to service. Later works, not covered by this contract, will encompass non-critical long-term redesign of the system.