Housing Related to Short Term Accommodation and Emergency Temporary Accommodation Barrow in furness
Buyer: Westmorland and Furness Council
Value not published
Open
Submission deadline: Dec 9, 2026, 12:00 PM UTC
| Status | Open |
|---|---|
| Estimated value | Value not published |
| Submission deadline | Jan 7, 2027, 02:00 PM UTC |
| Published | Nov 19, 2026 |
| Buyer | Westmorland and Furness Council |
| Country | United Kingdom · Kendal |
| CPV code | 45221113, 71322000 |
| Source | Find a Tender ↗ |
Checked:
The original notice takes precedence. Its status and conditions can change after collection.
The Authority is seeking a contractor to design and build a new 34 metre two span footbridge over the South Tyne River along Public Right of Way 302146, near the area known as Dryburn near Garrigill and in the Alston parish. The bridge will be required to be at 1.2 minimum walking width, with a pier design suitable for the frequent flash flooding that led to the previous footbridge failing.
The PRoW forms part of the Pennine Way National Trail and the work will need to be carried out to National Trails Quality Standards. The bridge would sit within the Alston parish and nearby the remote village of Garrigill, a remote location within the North Pennines National Landscape.
The project is to be let as a 2 stage Design and Build contract with the contractor being responsible for completion of a full design and obtaining all necessary consents, permits and orders (Stage 1) to allow construction works (Stage 2) to commence as soon as possible after 1st April 2028 (subject to funding), and where required making best use of the in-river working window of 16th June to 30th September.