D1204 Pond Project: Phase 1 Scheme and Detailed Design
Buyer: Nuclear Restoration Services Limited
£1,500,000
Open
Submission deadline: Dec 10, 2026, 12:00 PM UTC
| Status | Awarded |
|---|---|
| Estimated value | Value not published |
| Submission deadline | Deadline not published |
| Published | Nov 17, 2026 |
| Buyer | Nuclear Restoration Services Limited |
| Country | United Kingdom · Warrington |
| CPV code | 71600000, 79415200 |
| Source | Find a Tender ↗ |
This notice is no longer open for submissions. The original remains available for reference.
| Awarded supplier / winner | Registration / LEI number | Country | Awarded contract amount | Award date |
|---|---|---|---|---|
| Fortum Power and Heat Oy Keilalahdentie 2-4 Espoo Finland, Espoo, 02150 matti.kaisanlahti@fortum.com | GB-PPON: PNTC-1249-WCTY | Finland | Value not published | Nov 17, 2026 |
Buyer: Nuclear Restoration Services Limited
£1,500,000
Open
Submission deadline: Dec 10, 2026, 12:00 PM UTC
Buyer: BMet College
£150,000
Open
Submission deadline: Dec 11, 2026, 12:00 PM UTC
Buyer: London Borough of Haringey
£210,000
Open
Submission deadline: Dec 11, 2026
Buyer: Environment Agency
£49,995
Open
Submission deadline: Dec 18, 2026, 05:30 PM UTC
Buyer: NOREADE SIDEN-SIAN
Value not published
Open
Submission deadline: Jan 8, 2027, 12:00 PM UTC
Checked:
The original notice takes precedence. Its status and conditions can change after collection.
The Dounreay Wet Silo contains solids and sludges stored under water in a below ground vault, split into 2 hydraulically linked compartments. The volume of liquor is estimated to be between 150m3 – 200m3. NRS Dounreay is investigating an option to provide a modular liquor treatment capability using an Ion Exchange process.
This notice provides advanced information for the procurement of a proposed Feasibility Study consisting of the following aspects:
Provide consultation and support to Silo liquor sampling.
Use analytical data to develop a suitable ion exchange treatment process.
Perform (or direct) inactive and active liquor IX processing trials to underpin a ‘modular’ type treatment plant design.
Produce a feasibility report recording the development and proposals for the treatment plant, including an outline concept of the plant.