Key facts

StatusAwarded
Estimated value£39,836
Submission deadlineDeadline not published
PublishedNov 12, 2026
BuyerUniversity of Exeter
CountryUnited Kingdom · Exeter
CPV code50712000
SourceFind a Tender ↗
Open official notice

Buyer competition & track record

View buyer →
Collected notices321 open
Confirmed contracts28Top winners by contract awards: Berg Kaprow Lewis LLP
Top-3 winner concentration10.7%Top-1: 3.6% · n=28

Contract outcome & evergreen alternatives

This notice is no longer open for submissions. The original remains available for reference.

Awarded supplier / winnerRegistration / LEI numberCountryAwarded contract amountAward date
Intoheat Ltd
3 Oaktree Place, Manaton Close, Matford Business Park, Exeter, EX2 8WA
exeter@intoheat.co.uk
GB-PPON: PNXR-5864-VJBNUnited Kingdom£39,836Oct 17, 2026

Open tenders from this buyer (University of Exeter)

Open tenders in this CPV category (CPV 50000000 · View CPV × country award matrix)

Check eligibility, thresholds & deadlines

Checked:

The original notice takes precedence. Its status and conditions can change after collection.

Description

Supply, deliver and install 1no Daikin VAM 1500J c/w external enclosure located as per the design intend drawing. Ventilation system design to deliver 400 L/S based upon an occupancy of 50 at 8 L/S per person. Supply, deliver & install 2no 1500mm long attenuators on the supply air and return air Supply, deliver and install 4no 250mm 900mm long attenuators fixed to the exhaust and fresh air connections on the VAM. Supply and install 2no 250mm 1phase 3kw inline electric heater battery to the fresh air inlets onto the VAM unit Supply and install galvanised ductwork system generally as per design intent drawing, including big foot frame for Daikin VAM unit and external ductwork. Installation of return air grille and up to 50no 65mm black stainless steel louvred vents as below. Design, supply and install BMS control wiring to VAM unit and new occupancy sensor, connected to the existing BMS system. Update site system and graphics to operate new ventilation system based upon CO2/Temp & occupancy. Supply and install new power supplies to the VAM unit and 2no inline electric heater battery’s. Connection made to existing distribution board. Thermally insulate external ductwork and clad with black venture clad