Relocation of 132kV UKPN Cut Throat Lane Switching Station

Key facts

StatusEarlier publication
Estimated value£22,076,599.33
Submission deadlineDeadline not published
PublishedNov 11, 2026
BuyerEast West Rail Company Limited
CountryUnited Kingdom · MILTON KEYNES
CPV code31321000, 31200000, 31321100, 65300000, 65000000, 45000000, 45100000
SourceFind a Tender ↗

A later publication is available for this procurement. Open the latest publication →

Open official notice

Buyer competition & track record

View buyer →
Collected notices30 open
Confirmed contracts3Top winners by contract awards: UK Power Networks Operations Ltd

Contract outcome & evergreen alternatives

Awarded supplier / winnerRegistration / LEI numberCountryAwarded contract amountAward date
UK Power Networks Operations Ltd
Newington House, 237 Southwark Bridge Road, London, SE1 6NP
ConnectionAcceptance@ukpowernetworks.co.uk
GB-COH: 03870728United Kingdom£22,076,599.33Nov 11, 2026

Open tenders in this CPV category (CPV 31000000 · View CPV × country award matrix)

Check eligibility, thresholds & deadlines

Checked:

The original notice takes precedence. Its status and conditions can change after collection.

Description

East West Rail Co. (The Authority) is delivering the East West Rail programme, a nationally significant infrastructure project providing new and upgraded rail connections between Oxford, Milton Keynes, Bedford and Cambridge.
As part of the delivery of the proposed six-track railway corridor north of Bedford, the railway infrastructure interfaces with existing 132kV electricity distribution assets owned and operated by UK Power Networks Operations Ltd at the Fairfield Park / Cut Throat Lane Switching Station north of Bedford. The existing switching station lies within the footprint of the proposed railway works and must be relocated to enable construction of the railway.
The contract comprises the design, decommissioning, relocation, installation, testing and commissioning of a replacement 132kV switching station, together with all associated electrical, civil and enabling works required to maintain network resilience and continuity of supply, and to facilitate the transfer of services from the existing installation to the replacement facility.
The requirement comprises non-contestable electricity network works that may only be undertaken by the licensed Distribution Network Operator in accordance with the statutory framework established under the Electricity Act 1989 (as amended). As the owner, operator and licensed Distribution Network Operator for the affected network assets, UK Power Networks Operations Ltd is the only organisation with the legal authority and technical responsibility to undertake the required works.
Accordingly, competition is absent for technical and exclusive rights reasons. The Authority therefore intends to award the contract directly to UK Power Networks Operations Ltd. The Authority considers that the conditions for a direct award under Schedule 5, Paragraph 5 (a) and (b) of the Procurement Act 2023 are satisfied, as the works can only be supplied by a particular supplier due to the absence of competition arising from exclusive rights.