Provision of UPS - MEICA-UPS-01

Key facts

StatusClosing soon
Estimated value£500,000
Submission deadlineNov 25, 2026, 02:55 PM UTC
PublishedNov 19, 2026
BuyerBIP SOLUTIONS LIMITED
CountryUnited Kingdom · London
CPV code34632300
SourceUK Contracts Finder ↗
Open official notice
Status
Closing soon
Estimated value
£500,000
Submission deadline
Nov 25, 2026, 02:55 PM UTC
Published
Nov 19, 2026
Buyer
BIP SOLUTIONS LIMITED
Country
United Kingdom
CPV code
34632300
Source
UK Contracts Finder

Checked:

The original notice takes precedence. Its status and conditions can change after collection.

Description

The Subcontractor shall design, manufacture, supply, deliver, test and commission 4 No. complete UPS systems: 1 No. at Stoneleigh, 1 No. at Canley Brook and 2 No. at Burton Green.

1. Technical Requirements
Each UPS shall be rated at 210 kVA, 400 V, with 4 x 60 kW power modules and N+1 hot-swappable architecture. The Subcontractor shall demonstrate that the required connected load remains supported with one power module unavailable.
Requirement Stoneleigh Canley Brook Burton Green
Battery sizing load 35 kW 17 kW 70 kW
Connected design load 31 kW TBC 66 kW
Protection breaker 100 A 100 A 250 A
Separate static switch N/A N/A 400 A, 400 V

Each UPS shall provide an output fault current of 987 A for 200 ms. Supplier submissions shall demonstrate compatibility with the project protection requirements.

2. Batteries
Provide complete VRLA battery systems, including racks/enclosures, interconnections, isolation and protection, delivering 90 minutes' autonomy at the specified battery sizing load. Batteries shall recharge to 95% within 900 minutes. Submit sizing and recharge calculations.

3. Transformers and Ancillary Equipment
Provide 250 kVA, 1:1, Dzn0 input and output isolation transformers, together with ATS, static switching and external maintenance bypass arrangements required by the approved site-specific drawings. ATS shall be 400 A, four-pole where indicated.

Include all interconnecting cables, battery cables, protective devices and terminations identified as the UPS supplier's responsibility. Coordinate interfaces with incoming supplies and UPS switchboards.

4. Monitoring
Provide BMS interfaces for battery DC voltage, charge percentage, battery alarms/faults and charger status/alarms. Include communications protocols, interface hardware and point schedules for the UPS, ATS and UPS switchboard, with interface testing.

5. Delivery and Coordination
Scheduled UPS cabinet dimensions are 1,200 W x 1,996 H x 1,100 D mm. Confirm complete equipment footprints, weights, clearances and delivery requirements before manufacture.

6. Testing and Handover
Include FAT, commissioning, SAT and resistive load bank testing, with all temporary equipment, connections and removal. Demonstrate capacity, autonomy, recharge, redundancy, transfer/bypass operation, alarms and communications. Provide evidence of fault-current performance.

Submit equipment drawings, schematics, protection data, test procedures/results, commissioning records, as-built information and O&M manuals.

Suppliers shall identify proposed equipment and deviations. Confirm the missing Canley Brook design load, whether Burton Green loads apply per UPS, and site-specific equipment quantities and supply boundaries before manufacture.

Additional information: Please review attached schematic and narrative specification.