Hungary – Parts of engines or motors – Gépek,eszközök alkatrészellátás,szerviz beszerzése
Acheteur: Állampusztai Mezőgazdasági és Kereskedelmi Kft.
Montant non publié
Ouvert
Date limite: 21 déc. 2026, 11:00 UTC
| Statut | Attribué |
|---|---|
| Montant estimé | Montant non publié |
| Date limite | Date limite non publiée |
| Publié | 13 nov. 2026 |
| Acheteur | Electricity Supply Board ( ESB ) |
| Pays | Irlande · Dublin |
| Code CPV | 42417200, 42417210, 51511200 |
| Source | Tenders Electronic Daily (TED) ↗ |
Cet avis n’accepte plus d’offres. L’original reste disponible à titre de référence.
| Attributaire / titulaire | Numéro d’immatriculation / LEI | Pays | Montant du contrat attribué | Date d’attribution |
|---|---|---|---|---|
| Caltech srl via vincenzo bellini 41/c, Via Vincenzo Bellini 41/C -84090, Montecorvino Pugliano (SA) - Italy luigi.colucci@cal-tech.it | IT-REG: 05762170651 | Italie | Montant non publié | 31 juil. 2026 |
Acheteur: Állampusztai Mezőgazdasági és Kereskedelmi Kft.
Montant non publié
Ouvert
Date limite: 21 déc. 2026, 11:00 UTC
Acheteur: Spółka Restrukturyzacji Kopalń S.A.
Montant non publié
Ouvert
Date limite: 27 nov. 2026, 07:00 UTC
Acheteur: ΔΗΜΟΣ ΚΟΜΟΤΗΝΗΣ
572 500 €
Ouvert
Date limite: 28 déc. 2026, 12:00 UTC
Acheteur: Universitätsklinikum Magdeburg A.ö.R.
Montant non publié
Ouvert
Date limite: 21 déc. 2026, 09:00 UTC
Vérifié:
L’avis officiel fait foi. Son statut et ses conditions peuvent évoluer après la collecte.
The Contracting Entity intends to procure a contract for the design, manufacture, installation (Option) and commissioning of 3 x FGD ash injection (LOT 1) and/or 1 x batching plant ash injection systems (LOT 2). ESB as the contracting entity, will be responsible for reclaiming the ash from the ASA and locating it into newly designed and constructed ash unloading facility, at the base of the planned injection systems. It is proposed that the Contract will include the design, manufacture, Installation (Option) and commissioning of 3 x FGD (LOT 1) and 1 x batching plant (LOT 2) ash injection systems. The proposed systems will be capable of elevation and subsequent injection of ash, with the stated properties, to the 3 x unit FGD’s at elevations of circa 17.5m injection point and Batching plant at circa 14.5m injection point. The required feed rates capabilities of the new systems are ash feed in rates to each unit FGD of approx. 3 to 5 tonne/hour and the Batching plant at a rate of approx. 30 to 50 tonne/hour.
The Contracting Entity intends to procure a contract for the design, manufacture, installation (Option) and commissioning of 3 x FGD ash injection (LOT 1) and/or 1 x batching plant ash injection systems (LOT 2). ESB as the contracting entity, will be responsible for reclaiming the ash from the ASA and locating it into newly designed and constructed ash unloading facility, at the base of the planned injection systems. It is proposed that the Contract will include the design, manufacture, Installation (Option) and commissioning of 3 x FGD (LOT 1) and 1 x batching plant (LOT 2) ash injection systems. The proposed systems will be capable of elevation and subsequent injection of ash, with the stated properties, to the 3 x unit FGD’s at elevations of circa 17.5m injection point and Batching plant at circa 14.5m injection point. The required feed rates capabilities of the new systems are ash feed in rates to each unit FGD of approx. 3 to 5 tonne/hour and the Batching plant at a rate of approx. 30 to 50 tonne/hour.
The Contracting Entity intends to procure a contract for the design, manufacture, installation (Option) and commissioning of 3 x FGD ash injection (LOT 1) and/or 1 x batching plant ash injection systems (LOT 2). ESB as the contracting entity, will be responsible for reclaiming the ash from the ASA and locating it into newly designed and constructed ash unloading facility, at the base of the planned injection systems. It is proposed that the Contract will include the design, manufacture, Installation (Option) and commissioning of 3 x FGD (LOT 1) and 1 x batching plant (LOT 2) ash injection systems. The proposed systems will be capable of elevation and subsequent injection of ash, with the stated properties, to the 3 x unit FGD’s at elevations of circa 17.5m injection point and Batching plant at circa 14.5m injection point. The required feed rates capabilities of the new systems are ash feed in rates to each unit FGD of approx. 3 to 5 tonne/hour and the Batching plant at a rate of approx. 30 to 50 tonne/hour.