Ice Rink Chillers & Cooling Circuit Replacement
Acheteur: Oxford City Council
1 000 000 £GB
Ouvert
Date limite: 22 déc. 2026, 12:00 UTC
| Statut | Attribué |
|---|---|
| Montant estimé | 133 350 000 € |
| Date limite | Date limite non publiée |
| Publié | 13 nov. 2026 |
| Acheteur | The European Joint Undertaking for ITER and the Development of Fusion Energy ('Fusion for Energy') |
| Pays | Espagne · Barcelona |
| Code CPV | 42150000, 42000000, 31630000 |
| Source | Tenders Electronic Daily (TED) ↗ |
Cet avis n’accepte plus d’offres. L’original reste disponible à titre de référence.
| Attributaire / titulaire | Numéro d’immatriculation / LEI | Pays | Montant du contrat attribué | Date d’attribution |
|---|---|---|---|---|
| ASTURFEITO S.A. Parque Empresarial Principado de Asturias, Avilés, 33417 | ES-REG: A33344078 | Espagne | 133 350 000 € | 13 nov. 2026 |
| DE PRETTO INDUSTRIE S.R.L. Via A. Fogazzaro, 5, Schio, 36015 | IT-REG: 00501150247 | Italie | 133 350 000 € | 13 nov. 2026 |
| SIMIC S.P.A Via Vittorio Veneto, Camerana, 12072 | IT-REG: 02121640045 | Italie | 133 350 000 € | 13 nov. 2026 |
| ASG SUPERCONDUCTORS S.P.A. Corso Perrone 73 R., Genova, 16152 | IT-REG: 01282370095 | Italie | 133 350 000 € | 13 nov. 2026 |
Acheteur: Oxford City Council
1 000 000 £GB
Ouvert
Date limite: 22 déc. 2026, 12:00 UTC
Acheteur: CA de Bethune Bruay Artois Lys Romane
Montant non publié
Ouvert
Date limite: 7 janv. 2027, 12:00 UTC
Acheteur: UNIVERSITY OF WARWICK
Montant non publié
Ouvert
Date limite: 21 déc. 2026, 12:00 UTC
Acheteur: UNIVERSITY OF WARWICK
Montant non publié
Ouvert
Date limite: 4 janv. 2027, 12:00 UTC
Vérifié:
L’avis officiel fait foi. Son statut et ses conditions peuvent évoluer après la collecte.
Supply of Neutral Beam Magnetic Shielding units (expected 2 units, up to a maximum of 3 units). Each system includes 9 resistive magnets and a passive shield composed by iron and carbon steel plates. Supply is based on build to print specification and include manufacturing design, procurement, manufacturing, factory assembly and testing, documentation and shipping to ITER. Typical coil dimension 4mx4m, 3 tons of copper conductor. Overall dimension of one shield is 15m x 5m x 5m, with a mass of 600 tons. Part of the passive shield has also nuclear safety function, being support of the Neutral Beam Vessel, and shall be manufactured according to RCCMR 2007 (support section). Material shall follow ITER requirement on impurities.
Supply of Neutral Beam Magnetic Shielding units (expected 2 units, up to a maximum of 3 units). Each system includes 9 resistive magnets and a passive shield composed by iron and carbon steel plates. Supply is based on build to print specification and include manufacturing design, procurement, manufacturing, factory assembly and testing, documentation and shipping to ITER. Typical coil dimension 4mx4m, 3 tons of copper conductor. Overall dimension of one shield is 15m x 5m x 5m, with a mass of 600 tons. Part of the passive shield has also nuclear safety function, being support of the Neutral Beam Vessel, and shall be manufactured according to RCCMR 2007 (support section). Material shall follow ITER requirement on impurities.