Tenders Electronic Daily (TED) · 787934-2026

Overhaul of English Electric/GEC EA2 power turbines

Faits clés (Key Facts)

StatutVérifier la source
Montant estiméMontant non publié
Date limiteDate limite non publiée
Publié12 nov. 2026
AcheteurFingrid Oyj
PaysFinlande · Helsinki
Code CPV50531000
SourceTenders Electronic Daily (TED) ↗
Ouvrir l’avis officiel
Statut
Vérifier la source
Montant estimé
Montant non publié
Date limite
Date limite non publiée
Publié
12 nov. 2026
Acheteur
Fingrid Oyj
Pays
Finlande
Code CPV
50531000
Source
Tenders Electronic Daily (TED)

Vérifié:

L’avis officiel fait foi. Son statut et ses conditions peuvent évoluer après la collecte.

Description

This procurement consists of overhaul of one (1) English Electric/GEC EA2 power turbine. The overhaul of Huutokoski unit 5 will take place in 2027. In addition to this, overhaul of four (4) English Electric/GEC EA2 power turbines, shall be quoted as mandatory options 1, 2, 3 and 4 (“Options”). The schedule for executing these options shall be decided later, but are preliminarily planned for years 2028 - 2031. The preliminary scope of supply for Huutokoski unit 5 overhaul consists of: 1) Disassembly of the power turbine to a level in which the rotor discs and stator vanes are removed from the unit 2) Inspection of all relevant parts, components and assemblies. Measurement and record of relevant clearances and dimensions 3) Supply and replacement of all consumables and one life components 4) Supply and replacement of all other potentially required spare parts 5) Repair of any damaged parts, components and assemblies 6) Reassembly of the unit 7) Commissioning The same scope of supply shall be quoted for the Options.

Lots

  1. Overhaul of English Electric/GEC EA2 power turbines

    This procurement consists of overhaul of one (1) English Electric/GEC EA2 power turbine. The overhaul of Huutokoski unit 5 will take place in 2027. In addition to this, overhaul of four (4) English Electric/GEC EA2 power turbines, shall be quoted as mandatory options 1, 2, 3 and 4 (“Options”). The schedule for executing these options shall be decided later, but are preliminarily planned for years 2028 - 2031. The preliminary scope of supply for Huutokoski unit 5 overhaul consists of: 1) Disassembly of the power turbine to a level in which the rotor discs and stator vanes are removed from the unit 2) Inspection of all relevant parts, components and assemblies. Measurement and record of relevant clearances and dimensions 3) Supply and replacement of all consumables and one life components 4) Supply and replacement of all other potentially required spare parts 5) Repair of any damaged parts, components and assemblies 6) Reassembly of the unit 7) Commissioning The same scope of supply shall be quoted for the Options.