Procurement of Modular Personnel Protection Barriers – 300061
Acheteur: Forsvarsbygg
Montant non publié
Ouvert
Date limite: 21 déc. 2026, 11:00 UTC
| Statut | Ouvert |
|---|---|
| Montant estimé | Montant non publié |
| Date limite | 16 déc. 2026, 11:00 UTC |
| Publié | 12 nov. 2026 |
| Acheteur | Forsvarsbygg |
| Pays | Norvège · OSLO |
| Code CPV | 45213331, 45100000, 45111200, 45210000, 45220000, 45232140, 45233200, 45235100, 45300000, 45310000, 45331000, 45422000 |
| Source | Tenders Electronic Daily (TED) ↗ |
Vérifié:
L’avis officiel fait foi. Son statut et ses conditions peuvent évoluer après la collecte.
The project is for the establishment of a new hangar facility for the rescue service in Bodø, based on the concept for a standard base with three helicopter docks (one stand-by dock and two maintenance docks), as well as the accompanying functions for operative operation, administration, workshop, storage and boarding. The site of the hangar facility is now located at "Stanghaugen", with good access to aircrafts operative areas in NLBO. The location is adapted to the design of the new airport and overall infrastructure. Landside access to the hangar facility is to be established from the east. On the air side, direct access will be established to the new TWY Y and runway, so that operative response time requirements and efficient traffic management are taken care of. See the tender documentation part III.
The project is for the establishment of a new hangar facility for the rescue service in Bodø, based on the concept for a standard base with three helicopter docks (one stand-by dock and two maintenance docks), as well as the accompanying functions for operative operation, administration, workshop, storage and boarding. The site of the hangar facility is now located at "Stanghaugen", with good access to aircrafts operative areas in NLBO. The location is adapted to the design of the new airport and overall infrastructure. Landside access to the hangar facility is to be established from the east. On the air side, direct access will be established to the new TWY Y and runway, so that operative response time requirements and efficient traffic management are taken care of. See the tender documentation part III.