Tenders Electronic Daily (TED) · 782409-2026

Legacy marine data and rights to publish legacy marine data to include all of Ireland 2026

Faits clés (Key Facts)

StatutAttribué
Montant estimé30 000 000 €
Date limiteDate limite non publiée
Publié10 nov. 2026
AcheteurDepartment of Climate Energy and the Environment
PaysIrlande · Dublin
Code CPV09310000
SourceTenders Electronic Daily (TED) ↗
Ouvrir l’avis officiel
Statut
Attribué
Montant estimé
30 000 000 €
Date limite
Date limite non publiée
Publié
10 nov. 2026
Acheteur
Department of Climate Energy and the Environment
Pays
Irlande
Code CPV
09310000
Source
Tenders Electronic Daily (TED)

Résultat d’attribution et marchés ouverts

Cet avis n’accepte plus d’offres. L’original reste disponible à titre de référence.

Marchés ouverts de cet acheteur (Department of Climate Energy and the Environment)

Vérifié:

L’avis officiel fait foi. Son statut et ses conditions peuvent évoluer après la collecte.

Description

The next phase of the State’s multi-phase approach to offshore wind delivery has seen a move to a plan-led model that will ensure ORE development and deployment is managed in a planned, strategic, and sustainable way, and enable a balanced equilibrium between achieving ORE objectives, while maintaining environmental protection, the economic well-being of local communities, and consideration of other activities taking place in our shared marine space. In turn, this will provide greater certainty for all maritime users as to where development will be situated. An important step in advancing Phase Two will be the use of forward spatial planning, and specifically the requirement to establish Offshore Renewable Energy (ORE) Designated Areas that will take place according to legislative provisions for Designated Maritime Area Plans (DMAPs) within the Maritime Area Planning (MAP) Act, 2021. This forward spatial planning will take an ecosystem-based approach, in line with EU and national policy, and will inter alia help to guide future investment and decision-making. The National DMAP will provide a spatial planning policy framework for offshore renewable energy deployment around Ireland’s coastline. The development and implementation of the National DMAP is currently underway. It will aim to designate sufficient maritime area to deliver Ireland’s ambition of having 20 GW of offshore renewable energy by 2040. Commencing with the South Coast DMAP, the State is undertaking comprehensive surveying activities through our partners in the Marine Institute (MI) and Geological Survey Ireland (GSI) or private surveyors as required to facilitate potential future offshore renewable energy development. This is taking place through a comprehensive programme of survey activity within the geographical area of each DMAP proposed and/or marine areas identified for offshore wind development within the future DMAPs, and/or marine areas identified for offshore wind development within the final DMAPs approved by the Oireachtas. In addition to the above anticipated programme of survey work, DCEE is seeking to supplement our own existing marine data with existing, high-quality, and unprocessed datasets which have been collected in recent years by private industry. This framework will focus on an all of Ireland approach (Irish Sea, Celtic Sea and Atlantic Ocean) and to potentially focus on other future DMAP areas as required. The maximum number of tenderers that can be placed on the Framework is twenty.

Lots

  1. Legacy marine data and rights to publish legacy marine data to include all of Ireland 2026

    The next phase of the State’s multi-phase approach to offshore wind delivery has seen a move to a plan-led model that will ensure ORE development and deployment is managed in a planned, strategic, and sustainable way, and enable a balanced equilibrium between achieving ORE objectives, while maintaining environmental protection, the economic well-being of local communities, and consideration of other activities taking place in our shared marine space. In turn, this will provide greater certainty for all maritime users as to where development will be situated. An important step in advancing Phase Two will be the use of forward spatial planning, and specifically the requirement to establish Offshore Renewable Energy (ORE) Designated Areas that will take place according to legislative provisions for Designated Maritime Area Plans (DMAPs) within the Maritime Area Planning (MAP) Act, 2021. This forward spatial planning will take an ecosystem-based approach, in line with EU and national policy, and will inter alia help to guide future investment and decision-making. The National DMAP will provide a spatial planning policy framework for offshore renewable energy deployment around Ireland’s coastline. The development and implementation of the National DMAP is currently underway. It will aim to designate sufficient maritime area to deliver Ireland’s ambition of having 20 GW of offshore renewable energy by 2040. Commencing with the South Coast DMAP, the State is undertaking comprehensive surveying activities through our partners in the Marine Institute (MI) and Geological Survey Ireland (GSI) or private surveyors as required to facilitate potential future offshore renewable energy development. This is taking place through a comprehensive programme of survey activity within the geographical area of each DMAP proposed and/or marine areas identified for offshore wind development within the future DMAPs, and/or marine areas identified for offshore wind development within the final

    30 000 000 €