Asbestos Remediation Services and Air Monitoring Framework
Acheteur: Bristol City Council
3 500 000 £GB
Ouvert
Date limite: 15 janv. 2027, 12:00 UTC
| Statut | Attribué |
|---|---|
| Montant estimé | 35 599 £GB |
| Date limite | Date limite non publiée |
| Publié | 26 nov. 2026 |
| Acheteur | Kent and Medway Mental Health NHS Trust |
| Pays | Royaume-Uni · Maidstone |
| Code CPV | 45331000 |
| Source | Find a Tender ↗ |
Cet avis n’accepte plus d’offres. L’original reste disponible à titre de référence.
| Attributaire / titulaire | Numéro d’immatriculation / LEI | Pays | Montant du contrat attribué | Date d’attribution |
|---|---|---|---|---|
| NexGen Carbon Zero Ltd Unit 1, The Triton Centre, Premier Way,, Romsey, SO51 9DJ michelle@nexgenheating.com | GB-COH: 14543809 | Royaume-Uni | 35 599 £GB | 30 juil. 2026 |
Acheteur: Bristol City Council
3 500 000 £GB
Ouvert
Date limite: 15 janv. 2027, 12:00 UTC
Acheteur: Thanet District Council
2 035 396 £GB
Ouvert
Date limite: 8 janv. 2027, 14:00 UTC
Acheteur: Isle of Wight Council
200 000 £GB
Ouvert
Date limite: 8 janv. 2027, 14:00 UTC
Acheteur: BLACKPOOL HOUSING COMPANY LIMITED
700 000 £GB
Ouvert
Date limite: 24 déc. 2026, 12:00 UTC
Vérifié:
L’avis officiel fait foi. Son statut et ses conditions peuvent évoluer après la collecte.
The contract is for the supply and installation of a Infrared heating system at the Brenchley Unit, Maidstone. The works comprise the provision and installation of infrared ceiling heating elements, transformers, zoned smart controls, associated cabling and electrical connections, power supplies and required electrical components.
The works also include installation and integration of the heating system, cable management and associated finishing works, system commissioning, electrical certification, end-user set-up and training, and technical support. The system provides individually controlled heating zones together with centralised remote control functionality.
The works are intended to provide an energy-efficient, low-carbon replacement for the existing space-heating arrangements and improve the control of heating across the building.