Asbestos Remediation Services and Air Monitoring Framework
Acheteur: Bristol City Council
3 500 000 £GB
Ouvert
Date limite: 15 janv. 2027, 12:00 UTC
| Statut | Attribué |
|---|---|
| Montant estimé | 213 580,59 £GB |
| Date limite | Date limite non publiée |
| Publié | 25 nov. 2026 |
| Acheteur | University of Sunderland |
| Pays | Royaume-Uni · Sunderland |
| Code CPV | 45453100 |
| Source | Find a Tender ↗ |
Cet avis n’accepte plus d’offres. L’original reste disponible à titre de référence.
| Attributaire / titulaire | Numéro d’immatriculation / LEI | Pays | Montant du contrat attribué | Date d’attribution |
|---|---|---|---|---|
| Vest Construction (LIVECO) Ltd Bishop Auckland | GB-COH: 05286542 | Royaume-Uni | 213 580,59 £GB | 10 août 2026 |
Acheteur: Bristol City Council
3 500 000 £GB
Ouvert
Date limite: 15 janv. 2027, 12:00 UTC
Acheteur: Thanet District Council
2 035 396 £GB
Ouvert
Date limite: 8 janv. 2027, 14:00 UTC
Acheteur: Isle of Wight Council
200 000 £GB
Ouvert
Date limite: 8 janv. 2027, 14:00 UTC
Acheteur: BLACKPOOL HOUSING COMPANY LIMITED
700 000 £GB
Ouvert
Date limite: 24 déc. 2026, 12:00 UTC
Vérifié:
L’avis officiel fait foi. Son statut et ses conditions peuvent évoluer après la collecte.
The project will deliver a comprehensive refurbishment of the male and female changing areas, team changing rooms, shower facilities and associated WCs. Works include replacement of flooring, ceilings, lighting, sanitaryware, shower installations, cubicles, vanity units, locker doors and hand dryers, alongside full redecoration and upgrades to changing room furnishings. The scope also extends to the refurbishment of two assisted shower rooms and an assisted WC adjacent to the main changing areas.
Cityspace male and female changing spaces which include the WC's, shower facilities and changing spaces, also incorporating the home and away teams changing spaces. The works will consist of the replacement of all flooring, suspended ceilings, lighting, full redecoration, WC cubicles, WC wash hand basins, toilet pans and urinals, shower units, installation of new shower cubicles, installation of new vanity units, which will include large mirrors, fixed hair dryers, and power sockets for electric beauty products, new locker doors, a refresh of the changing room benches, new electric hand driers and full length mirrors.
Works also included within the City Space works is the replacement of floor finishes and redecoration to the two assisted shower rooms and the assisted WC within the corridor outside of the main changing rooms.