Swimming Transport for Primary Schools
Acheteur: Bolton Metropolitan Borough Council
Montant non publié
Ouvert
Date limite: 4 janv. 2027, 16:00 UTC
| Statut | Attribué |
|---|---|
| Montant estimé | Montant non publié |
| Date limite | Date limite non publiée |
| Publié | 25 nov. 2026 |
| Acheteur | West Mercia Police and Crime Commissioner |
| Pays | Royaume-Uni · Worcester |
| Code CPV | 34144900, 31158000, 31158100, 09331000, 09332000, 45310000 |
| Source | Find a Tender ↗ |
Cet avis n’accepte plus d’offres. L’original reste disponible à titre de référence.
| Attributaire / titulaire | Numéro d’immatriculation / LEI | Pays | Montant du contrat attribué | Date d’attribution |
|---|---|---|---|---|
| Joju Ltd Aldersgate Street, London, EC1A 4AE tenders@joju.co.uk · 447951063239 | GB-PPON: PWWJ-4136-CDNR | Royaume-Uni | Montant non publié | 25 nov. 2026 |
Acheteur: Bolton Metropolitan Borough Council
Montant non publié
Ouvert
Date limite: 4 janv. 2027, 16:00 UTC
Acheteur: Department for Science, Innovation & Technology
1 250 000 £GB
Ouvert
Date limite: 30 déc. 2026, 14:00 UTC
Acheteur: East Dunbartonshire Council
180 000 £GB
Ouvert
Date limite: 13 janv. 2027, 12:00 UTC
Acheteur: ORE Catapult
Montant non publié
Ouvert
Date limite: 11 janv. 2027, 13:00 UTC
Vérifié:
L’avis officiel fait foi. Son statut et ses conditions peuvent évoluer après la collecte.
Design, supply, installation and commissioning of an integrated electric vehicle (EV) charging solution for West Mercia Police, comprising EV chargers, photovoltaic (PV) solar canopies, battery energy storage systems (BESS), associated electrical infrastructure, energy management systems and related works. The solution will support the electrification of the operational fleet, address site grid constraints and provide resilient charging infrastructure for operational policing requirements.
This contract is to be awarded under section 41 of the Procurement Act 2023 relying on Schedule 5, paragraph 13 (extreme and unavoidable urgency). Delivery is required within externally imposed funding timescales and associated operational requirements. A competitive procurement process is considered impracticable within the available timeframe due to the need for design, mobilisation, security clearance, grid coordination and installation activities necessary to achieve delivery before the funding deadline. The circumstances giving rise to the urgency are not attributable to the contracting authority.