Asbestos Remediation Services and Air Monitoring Framework
Acheteur: Bristol City Council
3 500 000 £GB
Ouvert
Date limite: 15 janv. 2027, 12:00 UTC
| Statut | Attribué |
|---|---|
| Montant estimé | 4 166 667 £GB |
| Date limite | Date limite non publiée |
| Publié | 24 nov. 2026 |
| Acheteur | Harlow Council |
| Pays | Royaume-Uni · Harlow |
| Code CPV | 45000000 |
| Source | Find a Tender ↗ |
Cet avis n’accepte plus d’offres. L’original reste disponible à titre de référence.
| Attributaire / titulaire | Numéro d’immatriculation / LEI | Pays | Montant du contrat attribué | Date d’attribution |
|---|---|---|---|---|
| Infinity Fire Prevention Rochester | GB-COH: 08320320 | Royaume-Uni | 4 166 667 £GB | 24 nov. 2026 |
| Bell Group Limited Airdrie | GB-COH: SC0114142 | Royaume-Uni | 4 166 167 £GB | 24 nov. 2026 |
| Sureserve Compliance Fire Basildon | GB-COH: 02504054 | Royaume-Uni | 4 166 667 £GB | 24 nov. 2026 |
Acheteur: Bristol City Council
3 500 000 £GB
Ouvert
Date limite: 15 janv. 2027, 12:00 UTC
Acheteur: Thanet District Council
2 035 396 £GB
Ouvert
Date limite: 8 janv. 2027, 14:00 UTC
Acheteur: Isle of Wight Council
200 000 £GB
Ouvert
Date limite: 8 janv. 2027, 14:00 UTC
Acheteur: BLACKPOOL HOUSING COMPANY LIMITED
700 000 £GB
Ouvert
Date limite: 24 déc. 2026, 12:00 UTC
Vérifié:
L’avis officiel fait foi. Son statut et ses conditions peuvent évoluer après la collecte.
he Works comprise outstanding and emerging FRA remedial actions and directly associated or consequential fire-safety works. The scope includes passive fire protection and compartmentation, including loft and roof-void compartmentation; fire stopping and cavity barriers; fire doors, door sets, door components, fire-rated glazing and access panels; active fire-protection systems where instructed; intrusive verification, surveys, inspections and testing necessary to define or complete remedial work; associated builders work, making good, access and temporary works; and other work expressly identified in an Order that is directly connected to a fire-safety requirement.
he Works comprise outstanding and emerging FRA remedial actions and directly associated or consequential fire-safety works. The scope includes passive fire protection and compartmentation, including loft and roof-void compartmentation; fire stopping and cavity barriers; fire doors, door sets, door components, fire-rated glazing and access panels; active fire-protection systems where instructed; intrusive verification, surveys, inspections and testing necessary to define or complete remedial work; associated builders work, making good, access and temporary works; and other work expressly identified in an Order that is directly connected to a fire-safety requirement.