Public Toilet Refurbishment
Acheteur: Winchcombe Town Council
100 000 £GB
Ouvert
Date limite: 20 janv. 2027, 12:00 UTC
| Statut | Attribué |
|---|---|
| Montant estimé | Montant non publié |
| Date limite | Date limite non publiée |
| Publié | 19 nov. 2026 |
| Acheteur | Castle Point Borough Council |
| Pays | Royaume-Uni · Benfleet |
| Code CPV | 45212140, 50870000 |
| Source | Find a Tender ↗ |
Cet avis n’accepte plus d’offres. L’original reste disponible à titre de référence.
| Attributaire / titulaire | Numéro d’immatriculation / LEI | Pays | Montant du contrat attribué | Date d’attribution |
|---|---|---|---|---|
| KOMPAN LIMITED Serenity House, Shirwell Crescent, Milton Keynes, MK4 1GA kompan.uk@kompan.com | GB-COH: 01704623 | Royaume-Uni | Montant non publié | 1 oct. 2026 |
Acheteur: Winchcombe Town Council
100 000 £GB
Ouvert
Date limite: 20 janv. 2027, 12:00 UTC
Acheteur: VIA EAST MIDLANDS LIMITED
20 000 000 £GB
Ouvert
Date limite: 15 janv. 2027, 11:00 UTC
Acheteur: Forestry Commission
150 000 £GB
Ouvert
Date limite: 5 janv. 2027, 12:00 UTC
Acheteur: Bristol City Council
60 000 £GB
Ouvert
Date limite: 24 déc. 2026, 12:00 UTC
Vérifié:
L’avis officiel fait foi. Son statut et ses conditions peuvent évoluer après la collecte.
The purpose of Lot 2 is to provide for the removal of existing playground safety surfacing and the installation of new safety surfacing at J H Burrows Playground, Rectory Road, Hadleigh, Benfleet, Essex, SS7 2NQ.
The Authority is seeking to replace the entirety of the safety surfacing at this playground to maintain safety compliance, visual quality and long term durability. The works under this lot will include:
• Removal of the existing safety surfacing in its entirety
• Disposal of removed materials in accordance with all relevant environmental and waste regulations
• Installation of new safety surfacing to match the existing design, layout and appearance
• Provision of surfacing that complies fully with BS EN 1177 (Impact Attenuating Playground Surfacing)
The playground is a well used public facility located close to residential properties. Contractors must therefore ensure high standards of workmanship, safety, durability and minimal disruption during the works.