Purchase and Conversion of Two (2) x Fleet Maintenance Response Vans
Acheteur: Dorset & Wiltshire Fire and Rescue Authority
Montant non publié
Ouvert
Date limite: 9 déc. 2026, 12:00 UTC
| Statut | Attribué |
|---|---|
| Montant estimé | 6 000 000 £GB |
| Date limite | Date limite non publiée |
| Publié | 18 nov. 2026 |
| Acheteur | Warrington Borough Council |
| Pays | Royaume-Uni · Warrington |
| Code CPV | 51100000 |
| Source | Find a Tender ↗ |
Cet avis n’accepte plus d’offres. L’original reste disponible à titre de référence.
| Attributaire / titulaire | Numéro d’immatriculation / LEI | Pays | Montant du contrat attribué | Date d’attribution |
|---|---|---|---|---|
| CONNECTED KERB LIMITED Third Floor , Cargo Works, 1-2 Hatfields, London, SE1 9PG bidmanager@connectedkerb.co.uk | GB-COH: 11062616 | Royaume-Uni | 6 000 000 £GB | 13 nov. 2026 |
Acheteur: Dorset & Wiltshire Fire and Rescue Authority
Montant non publié
Ouvert
Date limite: 9 déc. 2026, 12:00 UTC
Acheteur: London Borough of Lambeth
450 000 £GB
Ouvert
Date limite: 18 déc. 2026, 12:00 UTC
Acheteur: South Holland District Council
120 000 £GB
Ouvert
Date limite: 15 déc. 2026, 12:00 UTC
Acheteur: СТОЛИЧНА ОБЩИНА
106 583,33 €
Ouvert
Date limite: 2 déc. 2026, 21:59 UTC
Vérifié:
L’avis officiel fait foi. Son statut et ses conditions peuvent évoluer après la collecte.
Warrington Borough Council were one of the local authorities to be successful in receiving funding through the Local EV Infrastructure (LEVI) Tranche 1 scheme.
The scheme aims to give drivers across the country better access to electric vehicle chargepoints. In Warrington, it will enable the roll out of a minimum of 450 additional chargepoint sockets, across the borough in areas where residents don't have access to off-street parking. It will also support the Authority's ongoing work, through its Electric Vehicle Strategy, to encourage many more motorists to convert to the use of electric vehicles.
The Authority has procured a Concessionaire who can provide a full end to end service with regards to electric vehicle charging infrastructure, including; supply, installation (including groundworks), operation, maintenance, consultancy/feasibility, software, back office solutions, customer support and investment.
Warrington's LEVI application was based around rolling out charging infrastructure across the borough in areas where residents do not have access to off-street parking.