Housing Removals and Storage
Acheteur: London Borough of Hillingdon
Montant non publié
Ouvert
Date limite: 15 janv. 2027, 17:00 UTC
| Statut | Ouvert |
|---|---|
| Montant estimé | Montant non publié |
| Date limite | 11 janv. 2027, 17:00 UTC |
| Publié | 18 nov. 2026 |
| Acheteur | London Borough of Hillingdon |
| Pays | Royaume-Uni · Uxbridge |
| Code CPV | 79314000 |
| Source | Find a Tender ↗ |
Vérifié:
L’avis officiel fait foi. Son statut et ses conditions peuvent évoluer après la collecte.
The purpose of the work is to identify, test and refine a movement
and public realm strategy. This Strategy must demonstrably achieve the following outcomes:
• Rebalance street space so the Town Centre functions primarily as a place for people rather than a
traffic corridor, by reducing excessive carriageway provision and re-purposing this space as a
high-quality public realm and placemaking opportunity that positively connects the shop parade,
allocated development sites and Hillingdon Underground Station;
• Improve the pedestrian and cycling infrastructure, delivering safer, more accessible, legible and
attractive routes within and through the Town Centre;
• Positively integrate the bus station identifying the optimal location to make this a high quality bus
interchange to include the Oxford Tube services, as a core component of the public realm;
• Identify safe, legible and deliverable access arrangements to the SHLAA site to the north of the junction, fully integrated with the wider movement network and public realm;
• Improves the Hillingdon Underground Station approach giving consideration to car park capacity, taxi provision and EV infrastructure;
• Accommodates movement infrastructure that connects through the Master Brewer site to and from the proposed Wealdstone Football Club development (5,900-10,000 capacity stadium) from the Hillingdon Underground Station and setting out additional facilities required for the stadium that would impact land take;
• Test the potential to remove the A40 slip road at the Hillingdon Town Centre, taking account of the proximity of alternative slip road provision to the west and wider network performance.