SprosRadar
Trouver des marchés
Find a Tender · 107605-2026

UOECS0594712026

Faits clés (Key Facts)

StatutAttribué
Montant estimé39 836 £GB
Date limiteDate limite non publiée
Publié12 nov. 2026
AcheteurUniversity of Exeter
PaysRoyaume-Uni · Exeter
Code CPV50712000
SourceFind a Tender ↗
Ouvrir l’avis officiel

Concurrence et historique de l’acheteur

Voir l’acheteur →
Avis recueillis321 ouvert
Contrats confirmés28Principaux attributaires: Berg Kaprow Lewis LLP
Concentration top-3 titulaires10,7%Top-1: 3,6% · n=28

Résultat d’attribution et marchés ouverts

Cet avis n’accepte plus d’offres. L’original reste disponible à titre de référence.

Attributaire / titulaireNuméro d’immatriculation / LEIPaysMontant du contrat attribuéDate d’attribution
Intoheat Ltd
3 Oaktree Place, Manaton Close, Matford Business Park, Exeter, EX2 8WA
exeter@intoheat.co.uk
GB-PPON: PNXR-5864-VJBNRoyaume-Uni39 836 £GB17 oct. 2026

Marchés ouverts de cet acheteur (University of Exeter)

Marchés ouverts dans ce CPV (CPV 50000000 · Matrice CPV × pays)

Vérifier seuils, délais et référentiels

Vérifié:

L’avis officiel fait foi. Son statut et ses conditions peuvent évoluer après la collecte.

Description

Supply, deliver and install 1no Daikin VAM 1500J c/w external enclosure located as per the design intend drawing. Ventilation system design to deliver 400 L/S based upon an occupancy of 50 at 8 L/S per person. Supply, deliver & install 2no 1500mm long attenuators on the supply air and return air Supply, deliver and install 4no 250mm 900mm long attenuators fixed to the exhaust and fresh air connections on the VAM. Supply and install 2no 250mm 1phase 3kw inline electric heater battery to the fresh air inlets onto the VAM unit Supply and install galvanised ductwork system generally as per design intent drawing, including big foot frame for Daikin VAM unit and external ductwork. Installation of return air grille and up to 50no 65mm black stainless steel louvred vents as below. Design, supply and install BMS control wiring to VAM unit and new occupancy sensor, connected to the existing BMS system. Update site system and graphics to operate new ventilation system based upon CO2/Temp & occupancy. Supply and install new power supplies to the VAM unit and 2no inline electric heater battery’s. Connection made to existing distribution board. Thermally insulate external ductwork and clad with black venture clad