DfI Rivers Directorate T-1163 Inspection and Maintenance of Underground Infrastructure Framework
Acheteur: DfI Transport and Road Asset Management (TRAM)
5 520 000 £GB
Ouvert
Date limite: 18 déc. 2026, 23:59 UTC
| Statut | Ouvert |
|---|---|
| Montant estimé | 13 100 000 £GB |
| Date limite | 10 déc. 2026, 15:00 UTC |
| Publié | 11 nov. 2026 |
| Acheteur | DfI Transport and Road Asset Management (TRAM) |
| Pays | Royaume-Uni · Belfast |
| Code CPV | 45200000, 45240000, 45246000 |
| Source | Find a Tender ↗ |
Vérifié:
L’avis officiel fait foi. Son statut et ses conditions peuvent évoluer après la collecte.
The Department for Infrastructure Rivers Directorate is establishing a Watercourse Maintenance Framework for the delivery of watercourse maintenance and flood defence related works across Northern Ireland. The Framework is intended to support the management of flood risk, maintenance of designated watercourses and associated drainage infrastructure, and the preservation of hydraulic capacity within the river network.
The Framework will operate for a period of four years and will be divided into five geographical Lots; comprising of:
- Lot 1 (WME1) Lisburn and Greater Belfast,
- Lot 2 (WMW1) Coleraine,
- Lot 3 (WMW2) Omagh,
- Lot 4 (WME2) Armagh, and
- Lot 5 (WMW3) Fermanagh.
For each Lot, the Authority intends to appoint a Primary Supplier and a Reserve Supplier. Call off contracts will be awarded as Measured Term Contracts (MTCs), with individual Works Orders ranging in value up to £250,000 (excluding VAT). The Framework is structured to promote continuity of service delivery, maintain competition and support supply chain resilience.
The scope of works may include, but is not limited to the following principal work activities:
A) Maintenance of designated watercourses,
B) Riverbank and flood defence maintenance and scrub clearance,
C) Tree felling/removal,
D) Provision of labour/plant' and
E) Treatment of aquatic weed/invasive species.
ICC Measured Term Contract for watercourse maintenance works within the Lisburn and Greater Belfast Contract Area (Works Orders valued up to £250k).
The proposed contract relates to works with a cumulative value of £2.76m (ex VAT) over a four year term. If the Contracting Authority is unable, for any reason, to award a new framework or to put in place an alternative regime to replace this Framework on its termination or expiry, any Call-Off Contract established under this Framework may be extended for a further period or periods up to a maximum of 12 additional months. This may increase the value to £3.45m (ex VAT).
3 450 000 £GB
ICC Measured Term Contract for watercourse maintenance works within the Coleraine Contract Area (Works Orders valued up to £250k).
The proposed contract relates to works with a cumulative value of £2.24m (ex VAT) over a four year term. If the Contracting Authority is unable, for any reason, to award a new framework or to put in place an alternative regime to replace this Framework on its termination or expiry, any Call-Off Contract established under this Framework may be extended for a further period or periods up to a maximum of 12 additional months. This may increase the value to £2.8m (ex VAT).
2 800 000 £GB
ICC Measured Term Contract for watercourse maintenance works within the Omagh Contract Area (Works Orders valued up to £250k).
The proposed contract relates to works with a cumulative value of £2.16m (ex VAT) over a four year term. If the Contracting Authority is unable, for any reason, to award a new framework or to put in place an alternative regime to replace this Framework on its termination or expiry, any Call-Off Contract established under this Framework may be extended for a further period or periods up to a maximum of 12 additional months. This may increase the value to £2.7m (ex VAT).
2 700 000 £GB
ICC Measured Term Contract for watercourse maintenance works within the Armagh Contract Area (Works Orders valued up to £250k).
The proposed contract relates to works with a cumulative value of £2.04m (ex VAT) over a four year term. If the Contracting Authority is unable, for any reason, to award a new framework or to put in place an alternative regime to replace this Framework on its termination or expiry, any Call-Off Contract established under this Framework may be extended for a further period or periods up to a maximum of 12 additional months. This may increase the value to £2.55m (ex VAT).
2 550 000 £GB
ICC Measured Term Contract for watercourse maintenance works within the Fermanagh Contract Area (Works Orders valued up to £250k).
The proposed contract relates to works with a cumulative value of £1.28m (ex VAT) over a four year term. If the Contracting Authority is unable, for any reason, to award a new framework or to put in place an alternative regime to replace this Framework on its termination or expiry, any Call-Off Contract established under this Framework may be extended for a further period or periods up to a maximum of 12 additional months. This may increase the value to £1.6m (ex VAT).
1 600 000 £GB