Key Destination Secure Cycle Parking
Acheteur: Bournemouth, Christchurch and Poole Council
500 000 £GB
Ouvert
Date limite: 15 janv. 2027, 14:00 UTC
| Statut | Attribué |
|---|---|
| Montant estimé | 239 450 £GB |
| Date limite | Date limite non publiée |
| Publié | 11 nov. 2026 |
| Acheteur | Bournemouth, Christchurch and Poole Council |
| Pays | Royaume-Uni · Bournemouth |
| Code CPV | 71220000, 71310000, 71530000 |
| Source | Find a Tender ↗ |
Cet avis n’accepte plus d’offres. L’original reste disponible à titre de référence.
| Attributaire / titulaire | Numéro d’immatriculation / LEI | Pays | Montant du contrat attribué | Date d’attribution |
|---|---|---|---|---|
| Kendall Kingscott Limited Spring Lodge, 172 Chester Road, Helsby, WA6 0AR marketing@kendallkingscott.co.uk | GB-COH: 04605743 | Royaume-Uni | 239 450 £GB | 15 juil. 2026 |
Acheteur: Bournemouth, Christchurch and Poole Council
500 000 £GB
Ouvert
Date limite: 15 janv. 2027, 14:00 UTC
Acheteur: Bournemouth, Christchurch and Poole Council
1 650 000 £GB
Ouvert
Date limite: 16 déc. 2026, 12:00 UTC
Acheteur: Bournemouth, Christchurch and Poole Council
360 000 £GB
Ouvert
Date limite: 10 déc. 2026, 14:00 UTC
Acheteur: BMet College
150 000 £GB
Ouvert
Date limite: 11 déc. 2026, 12:00 UTC
Acheteur: London Borough of Haringey
210 000 £GB
Ouvert
Date limite: 11 déc. 2026
Acheteur: Environment Agency
49 995 £GB
Ouvert
Date limite: 18 déc. 2026, 17:30 UTC
Acheteur: NOREADE SIDEN-SIAN
Montant non publié
Ouvert
Date limite: 8 janv. 2027, 12:00 UTC
Vérifié:
L’avis officiel fait foi. Son statut et ses conditions peuvent évoluer après la collecte.
Linwood School is a Special School with the main campus (Linwood Campus) located on Alma Road in the Winton East Ward. Due to rising need for specialist places, the school
has expanded into a number of satellite sites in Poole and Bournemouth and has also significantly increased the number of pupils on the main campus.
The purpose of the project is to adapt the former Parkfield School site into a campus of Linwood Special School. The primary changes required are to adapt a building intended as an all-through school for mainstream pupils into a school for KS2 (aged 7-11) through to KS5 (aged 16-18) pupils with a variety of specialist needs including Autistic Spectrum Condition and Social Emotional and Mental Health Needs.
The procurement exercise is to obtain the professional services of a suitably qualified architect to act as Principal Designer under CDM 2015 regulations and Principal Designer (as defined under the Building Safety Act 2022) and lead a team of specialist consultants from RIBA Stage 2 (Concept Design) to RIBA Stage 6 (Handover). The Design Lead, thus appointed will form part of the procurement team who, working alongside members of the
council's in-house client team, will procure the services of the remaining professional advisors to design, specify and manage the proposed package of works.