Connect to Work - Walsall, Wolverhampton & Sandwell
Acheteur: West Midlands Combined Authority
18 931 894,59 £GB
Ouvert
Date limite: 1 déc. 2026, 12:00 UTC
Cet avis n’accepte plus d’offres. L’original reste disponible à titre de référence.
Vérifié:
L’avis officiel fait foi. Son statut et ses conditions peuvent évoluer après la collecte.
The upgrade of Witton and Aston stations was identified as a Mayoral priority in April 2025, with delivery of the interventions to be completed ahead of the UEFA Euro 2028, which nearby Villa Park Stadium is set to host four international football matches.
We are now proposing to continue the development phase into Engineering Stage 5 with Network Rail and in parallel commence advanced enabling works activities ahead of a targeted completion ahead of UEFA Euro 2028.
Design Development
The project has proceeded through design stages ES3 and ES4 and now needs to progress to detailed design. This is Engineering Stage 5 (ES5) in Network Rail's PACE framework. Additional elements for the next design phase include Overhead Line Equipment (OLE) isolation works to minimise disruption to the network in advance of the enabling works and core construction work phases, preliminary / personnel costs, contingency, and property and planning costs associated with the Waterworks site.
Enabling Works Need
To achieve programme and completion in advance of UEFA Euro 2028, enabling works are required in parallel to ES5 (detailed design) development.
Vérifié:
Acheteur: West Midlands Combined Authority
18 931 894,59 £GB
Ouvert
Date limite: 1 déc. 2026, 12:00 UTC
Acheteur: Cote d'Ivoire Public Resource Management for Jobs and Growth
Montant non publié
Ouvert
Date limite: 19 nov. 2026
Acheteur: Saint Lucia Air and Sea Ports Authority
Montant non publié
Ouvert
Date limite: 30 nov. 2026
Acheteur: MINISTRY OF ECONOMY, PLANNING AND REGIONAL DEVELOPMENT
Montant non publié
Ouvert
Date limite: 4 déc. 2026
Acheteur: IMPROVING WOMEN AND GIRLS’ ACCESS TO IMPROVED HEALTH AND NUTRITION SERVICES IN PRIORITY AREAS
Montant non publié
Ouvert
Date limite: 25 nov. 2026