Blackdown Hills National Landscape Green Finance Accelerator - Floodplain reconnection outline designs, Weir Modifications and high risk water quality outfalls

Statut
Ouvert
Montant estimé
490 000 £GB
Date limite
30 nov. 2026, 12:00 UTC
Publié
5 nov. 2026
Acheteur
Devon County Council
Pays
Royaume-Uni
Code CPV
50116000, 77000000
Source
Find a Tender
Ouvrir l’avis officiel

Vérifié:

L’avis officiel fait foi. Son statut et ses conditions peuvent évoluer après la collecte.

Description

Lot 1 - River Wolf Wier Modifications. -Working with the Blackdown Hills National Landscape (BHNL) team to undertake detailed design work relating to two weir modifications on the river Wolf (that flows into the river Otter):
 Marles weir (near Awliscombe, Honiton)
 Weston weir (Heron's farm, near Honiton)
Lot 2 - Connecting the Culm FlooR3 Extension Project - To undertake Flood Risk Assessment preparation and progression to Detailed Design to improve flood resilience at the Hele Railway Crossing at the western mainline at 3 sites:
 Site 1, Smithincott Extension
 Site 2,Spratcot Site, Cullompton
 Site 3, Sheldon Catchment
Lot 3 - Water Quality Outfall - This capital development project will entail commissioning specialist consultants, overseen by a Project Steering Group, to deliver two main (water quality focussed) strands, focussing on the South West of England (not including Gloucestershire and Bath/ Bristol):

Lots

  1. River Wolf Wier Modifications

    Working with the Blackdown Hills National Landscape (BHNL) team to undertake detailed design work relating to two weir modifications on the river Wolf (that flows into the river Otter):
     Marles weir (near Awliscombe, Honiton)
     Weston weir (Heron's farm, near Honiton)

    270 000 £GB

  2. Connecting the Culm FlooR3 Extension Project

    To undertake Flood Risk Assessment preparation and progression to Detailed Design to improve flood resilience at the Hele Railway Crossing at the western mainline at 3 sites:
     Site 1, Smithincott Extension
     Site 2,Spratcot Site, Cullompton
     Site 3, Sheldon Catchment

    120 000 £GB

  3. Water Quality Outfall

    This capital development project will entail commissioning specialist consultants, overseen by a Project Steering Group, to deliver two main (water quality focussed) strands, focussing on the South West of England (not including Gloucestershire and Bath/ Bristol)

    100 000 £GB