Construction of 12 residential units (3 houses and 9 flats) at Maple Place redevelopment, Eastleigh
Acheteur: Eastleigh Borough Council
3 000 000 £GB
Ouvert
Date limite: 11 déc. 2026, 12:00 UTC
Vérifié:
L’avis officiel fait foi. Son statut et ses conditions peuvent évoluer après la collecte.
Forestry England is planning to refurbish Lodge Farm Cottage so it is fit to live in and can be rented out. We expect the work to cover general building, heating and plumbing, electrical and external works. The contractor we appoint would coordinate the works and give us the completion documents.
Working is detailed in the attached outline scope but would include:-
• Strip out the inside, clear the site and protect the existing building.
• New kitchen and bathroom, with the plumbing and electrical changes that go with them.
• New external oil boiler, changes to the heating system, a new hot water cylinder and the pipework.
• Plaster repairs, better insulation, decorating inside and minor carpentry.
• Electrical testing and certificates, lighting and extra power.
• Drainage and groundworks outside, lime pointing, repairs to the outhouse and a new well cover.
• Site welfare, security and waste removal, risk assessments and method statements, testing and commissioning, and handover information.
Acheteur: Eastleigh Borough Council
3 000 000 £GB
Ouvert
Date limite: 11 déc. 2026, 12:00 UTC
Acheteur: Powys County Council
4 100 000 £GB
Ouvert
Date limite: 15 janv. 2027, 12:00 UTC
Acheteur: Barcud Shared Services
34 213 333,36 £GB
Ouvert
Date limite: 7 déc. 2026, 12:00 UTC
Acheteur: Golding Homes
21 000 000 £GB
Ouvert
Date limite: 20 nov. 2026, 13:00 UTC
Acheteur: Wymering Manor Trust
Montant non publié
Ouvert
Date limite: 2 déc. 2026, 00:00 UTC