Procurement of Membrane Aerated Biofilm Reactor (MABR) systems
Acheteur: SEVERN TRENT WATER LIMITED
44 400 000 £GB
Ouvert
Date limite: 16 déc. 2026, 23:59 UTC
Vérifié:
L’avis officiel fait foi. Son statut et ses conditions peuvent évoluer après la collecte.
Energy Coast West Cumbria Limited, trading as BEC, invites tenders for the design, manufacture and supply of a factory-integrated, modular Adiabatic Compressed Air Energy Storage (A-CAES) demonstrator plant for the BEST CAES project at Westlakes Science Park, West Cumbria.
The requirement comprises an above-ground, transportable system incorporating compression, thermal storage, expansion equipment, compressed-air storage vessels, power electronics and controls, together with specified testing, documentation, training and warranty support. Required performance includes 0.333 MW charging, 1.0 MW discharge and a minimum electrical round-trip efficiency of 80%.
The maximum contract budget is £1,600,000 excluding VAT, with operational handover required by 30 June 2028. Long-term paid maintenance and supplementary rapid-response hardware are excluded from this award. The procurement will follow an open procedure and is subject to funding, planning permissions and necessary approvals.
1 600 000 £GB
Sam Burrows
01946 595 200
Vérifié:
Acheteur: SEVERN TRENT WATER LIMITED
44 400 000 £GB
Ouvert
Date limite: 16 déc. 2026, 23:59 UTC
Acheteur: Nottingham Trent University
60 000 £GB
Ouvert
Date limite: 2 déc. 2026, 10:00 UTC
Acheteur: LA FERMA COT
12 296 288,32 RON
Ouvert
Date limite: 27 nov. 2026
Acheteur: REPUBLIKA HRVATSKA MINISTARSTVO OBRANE
3 324 400 €
Ouvert
Date limite: 30 nov. 2026
Acheteur: Alexander Kuzminov trading as Nice Ice Cream
266 500 €
Ouvert
Date limite: 4 déc. 2026, 00:00 UTC