SprosRadar
Trouver des marchés
UK Contracts Finder (OCDS Awards) · eb0bfb8f-8617-4436-823d-af709d50b431-920184

New Hospital Programme - Hospital 2.0 Alliance (H2A) Framework Call-Off Contract for Leighton Hospital

Statut
Attribué
Montant estimé
738 000 000 £GB
Date limite
31 juil. 2026, 22:59 UTC
Publié
4 nov. 2026
Acheteur
Mid Cheshire Hospitals NHS Foundation Trust
Pays
Royaume-Uni
Code CPV
45215140
Source
UK Contracts Finder (OCDS Awards)

Résultat d’attribution et marchés ouverts

Cet avis n’accepte plus d’offres. L’original reste disponible à titre de référence.

Attributaire / titulaireNuméro d’immatriculation / LEIPaysMontant du contrat attribuéDate d’attribution
Integrated Health Projects Joint Venture
Eaton Ct,Maylands Ave HEMEL HEMPSTEAD HERTFORDSHIRE HP2 7TR GB
GB-CFS: 337366Royaume-Uni738 000 000 £GB31 juil. 2026

Marchés ouverts dans ce CPV (CPV 45000000 · Matrice CPV × pays)

Ouvrir l’avis officiel

Vérifié:

L’avis officiel fait foi. Son statut et ses conditions peuvent évoluer après la collecte.

Description

NHS England (NHSE) has concluded a competitive dialogue procurement under the Public Contracts Regulations 2015 for the establishment of the Hospital 2.0 Alliance Framework ("H2A Framework") and the Hospital 2.0 Alliance Agreement.
These two instruments form the basis of a multi-supplier integrated delivery model created to deliver the New Hospital Programme (NHP). The H2A Framework provides the mechanism for NHS Trusts to award Call-Off Contracts for schemes forming part of
the New Hospital Programme using a Model Call-Off Contract.
The Hospital 2.0 Alliance Agreement establishes the collaborative enterprise environment for NHSE, the Trusts, and the appointed H2A Contractors to foster alliance working and standardise design and delivery across the programme.
Following completion of the collaborative allocation process in accordance with the terms of the H2A Framework as procured and awarded,
Mid Cheshire Hospitals NHS Foundation Trust "the Trust" is now
awarding the Call-Off Contract for Leighton Hospital, utilising the H2A Framework and the Model Call-Off Contract. The value of the Call-Off Contract given in this notice reflects the estimated value of the Scheme for all stages. The terms of the Call-Off Contract
provide for the services and works to be performed in stages pursuant to the terms of the Model Call-Off Contract. Stage Zero Services comprise all the early constructability and advisory works to be completed in Stage Zero as set out in Scope S215 (Stage Zero
Services), and all other work, services and actions which the Call-Off Contract requires the Contractor to do during Stage Zero, with an estimated value of £1,815,718.20.
Stage One Services comprise all the pre-construction works to be completed in Stage One as set out in Scope S200 (Stage One Services), and all other work, services and actions which
the Call-Off Contract requires the Contractor to do during Stage One. Stage Two Works comprise all the remaining design and construction works forming part of the Scope to be carried out during Stage Two, including all tests, services and actions which the Call Off Contract requires the Contractor to do during Stage Two.
Progression from Stage Zero to Stage One and from Stage One to Stage Two is conditional on the relevant Notice to Proceed, the Trust and New Hospital Programme's approvals/governance.

Coordonnées professionnelles publiques

Chris Jones

chris.jones@mcht.nhs.uk

Vérifié:

Avis associés