CA18723 - Multidisciplinary Architectural and Design Team Services
Acheteur: BMet College
150 000 £GB
Ouvert
Date limite: 11 déc. 2026, 12:00 UTC
| Statut | Attribué |
|---|---|
| Montant estimé | 299 900 £GB |
| Date limite | 30 oct. 2026, 12:00 UTC |
| Publié | 10 nov. 2026 |
| Acheteur | MINING REMEDIATION AUTHORITY |
| Pays | Royaume-Uni · MANSFIELD |
| Code CPV | 71530000 |
| Source | UK Contracts Finder ↗ |
Cet avis n’accepte plus d’offres. L’original reste disponible à titre de référence.
| Attributaire / titulaire | Numéro d’immatriculation / LEI | Pays | Montant du contrat attribué | Date d’attribution |
|---|---|---|---|---|
| Slr Consulting Ltd Brockhill Court, B97 6RB | GB-COH: 03880506 | Royaume-Uni | 299 900 £GB | 30 oct. 2026 |
Acheteur: BMet College
150 000 £GB
Ouvert
Date limite: 11 déc. 2026, 12:00 UTC
Acheteur: BMet College
150 000 £GB
Ouvert
Date limite: 11 déc. 2026, 12:00 UTC
Acheteur: London Borough of Haringey
210 000 £GB
Ouvert
Date limite: 11 déc. 2026
Acheteur: Environment Agency
49 995 £GB
Ouvert
Date limite: 18 déc. 2026, 17:30 UTC
Vérifié:
L’avis officiel fait foi. Son statut et ses conditions peuvent évoluer après la collecte.
This notice is intended to inform that a call off from a Framework has taken place.
The Coalsnaughton Incident requires multidisciplinary engineering input across structural, geotechnical, mining and geological matters. WSP is undertaking significant elements of the technical work and engineering development for Phase 2 under separate commissions approved through the MRA Engineering Services Framework.
It is considered appropriate for the MRA to obtain independent technical assurance of key elements of this work. The appointment of SLR provides additional specialist challenge and advice to support the MRA in understanding the technical evidence presented, identifying material gaps or concerns and making informed decisions as the project progresses.
The scope includes:
• review of structural inspection reports relating to properties identified for demolition;
• technical review of proposed protection and demolition works;
• review and interpretation of available site characterisation information;
• engagement with BGS;
• review of relevant WSP technical information and deliverables;
• participation in technical and project meetings; and
• ongoing multidisciplinary technical advice.
The commission is deliberately structured as an assurance and advisory role. SLR will not replace the responsibilities of WSP or other designers and consultants, nor will they make decisions on behalf of the MRA.