Feasibility Study & Detail Designs of 8 (Eight ) Water Supply & Sanitation schemes from existing Boreholes .
Comprador: Afar Region RPCU
Valor não publicado
Aberta
Prazo de apresentação: 20 de nov. de 2026
Este aviso não está mais aberto para propostas. O original continua disponível para consulta.
| Fornecedor vencedor | Número de registro / LEI | País | Valor adjudicado do contrato | Data de adjudicação |
|---|---|---|---|---|
| CORE CONSULTING ENGINEERING PLC Nefas Silk Lafto Sub City, Wereda 04, H. No. 1594 Sarbet infront of Oromia Offices Addis Ababa | WB-VENDOR: 1004558 | Etiópia | US$ 1.495.575 | 7 de abr. de 2026 |
| Beneficial Ownership Details Form Date: 08-APR-26 | — | Serra Leoa | US$ 1.495.575 | 7 de abr. de 2026 |
| Summary of Reason The Consultant stated that no Beneficial Owners meets the condition | — | Serra Leoa | US$ 1.495.575 | 7 de abr. de 2026 |
| Scores Technical: 94.61 Consultant Specific Experience: 10 Methodology: 33.26 Key Personnel: 51.35 Financial: 30 Combined: 96.23 Rank: 1 | — | Serra Leoa | US$ 1.495.575 | 7 de abr. de 2026 |
Verificado:
O aviso oficial prevalece. Sua situação e condições podem mudar após a coleta.
Contract Award Project: P178683-Sierra Leone Connectivity and Agricultural Market Infrastructure Project Loan/Credit/TF Info: IDA-E3340 Bid/Contract Reference No: SL-MTA - TIDU-471479-CS-QCBS Procurement Method: QCBS-Quality And Cost-Based Selection Scope of Contract: Monitoring and Supervision of Works/Construction of Four (4) climate-resilient long-span bridges and their link roads. Lot 2 Notice Version No: 0 Date Notification of Award Issued (YYYY/MM/DD) 2026/04/07 Duration of Contract 30 Month(s) Minimum Qualifying Score 70 Awarded Firm(s): CORE CONSULTING ENGINEERING PLC (1004558) Nefas Silk Lafto Sub City, Wereda 04, H. No. 1594 Sarbet infront of Oromia Offices Addis Ababa Country: Ethiopia Beneficial Ownership Details Form Date: 08-APR-26 Summary of Reason The Consultant stated that no Beneficial Owners meets the condition Scores Technical: 94.61 Consultant Specific Experience: 10 Methodology: 33.26 Key Personnel: 51.35 Financial: 30 Combined: 96.23 Rank: 1 Final Evaluation Price USD 1495575.00 Signed Contract Price USD 1495575.00 Price: Currency: Amount: United States Dollars (United States Dollars) 1495575.00 Evaluated Firm(s): AIC PROGETTI S.P.A & TSC GLOBAL INC (1004568) Country: Italy Final Evaluation Price USD 3058510.00 Price: Currency: Amount: RENARDET SA & PARTNER CONSULTING ENGINEERING LLC & RENARDET S.A (1004567) Country: Oman Final Evaluation Price USD 58737741.46 Price: Currency: Amount: INTERCONTINENTAL CONSULTANT AND TECHNOCRATS PVT. LTD(ICT) (329037) Country: India Final Evaluation Price USD 1865010.00 Price: Currency: Amount: Rejected Firm(s): GIBB AFRICA LTD ASSOCIATION WITH PROSPECT ENGINEERING ENTERPRISES & SERVICES (1004559) Country: Kenya Final Evaluation Price Reason for Rejection Non-compliance Price: Currency: Amount: ILSHIN ENGINEERS & CONSULTANTS CO, LTD., YOOSHIN ENGINEERING CORPORATION & TECHSULT & COMPANY LIMITED (JV) (1004560) Country: Korea, Republic of Final Evaluation Price Reason for Rejection Non-compliance Price: Currency: Amount:
Comprador: Afar Region RPCU
Valor não publicado
Aberta
Prazo de apresentação: 20 de nov. de 2026
Comprador: Cross River State SPIN
Valor não publicado
Aberta
Prazo de apresentação: 30 de nov. de 2026
Comprador: Project Management Unit, School Education Department, Government of Balochistan
Valor não publicado
Aberta
Prazo de apresentação: 23 de nov. de 2026
Comprador: Project Management Unit, School Education Department, Government of Balochistan
Valor não publicado
Aberta
Prazo de apresentação: 24 de nov. de 2026
Comprador: Amhara Urban Development and Infrastructure Bureau
Valor não publicado
Aberta
Prazo de apresentação: 18 de nov. de 2026