Public Toilet Refurbishment
Comprador: Winchcombe Town Council
£ 100.000
Aberta
Prazo de apresentação: 20 de jan. de 2027, 12:00 UTC
| Situação | Adjudicada |
|---|---|
| Valor estimado | Valor não publicado |
| Prazo de apresentação | Prazo não publicado |
| Publicado | 24 de nov. de 2026 |
| Comprador | Miljødirektoratet |
| País | Noruega · Trondheim |
| Código CPV | 45000000, 14211000, 14212300, 14212400, 45100000, 45112360, 45112500, 45112710 |
| Fonte | Tenders Electronic Daily (TED) ↗ |
Este aviso não está mais aberto para propostas. O original continua disponível para consulta.
| Fornecedor vencedor | Número de registro / LEI | País | Valor adjudicado do contrato | Data de adjudicação |
|---|---|---|---|---|
| Risa Nærbø, 4365 false | NO-BRREG: 980404129 | Noruega | Valor não publicado | 19 de ago. de 2026 |
Comprador: Winchcombe Town Council
£ 100.000
Aberta
Prazo de apresentação: 20 de jan. de 2027, 12:00 UTC
Comprador: VIA EAST MIDLANDS LIMITED
£ 20.000.000
Aberta
Prazo de apresentação: 15 de jan. de 2027, 11:00 UTC
Comprador: Forestry Commission
£ 150.000
Aberta
Prazo de apresentação: 5 de jan. de 2027, 12:00 UTC
Comprador: Bristol City Council
£ 60.000
Aberta
Prazo de apresentação: 24 de dez. de 2026, 12:00 UTC
Verificado:
O aviso oficial prevalece. Sua situação e condições podem mudar após a coleta.
The sand deposit site (Knabensanden) at the disused Knaben molybdenum mines causes drainage of finely grained tailings (sand and silt) to the watercourse below. The purpose of the assignment is to carry out permanent measures that prevent this run-off. The molybdenum mines were closed down in 1973 and have left a disposal site. The tailings is the "worthless part" of the ore and consists of fine mineral particles. The sand deposit site covers an area of approx. 300 decares and has a thickness of up to 20 m. Stabilisation work has previously been carried out in connection with the sand deposit, in the early 2000s and in 2011-2012. There are both windblown sand and erosion that lead sand from the deposit site, to waterways downstream of the site, first and foremost to Store Knabetjønn. Asplan Viak has, on behalf of the Norwegian Environment Agency, prepared a plan with drawings and description of the measures to be carried out. Planned measures shall: • Empty sediment traps in Store Knabetjønn • Clean up established drainage channels around the sand deposit site, in order to manage surface water outside the site. • Transport the matter from the points above to the deposit site and lay out at the designated place at the site. • Stabilise the matter at the sand deposit site with the help of gravel and top-soil. Growth soil shall form the basis for a later procurement for planting and seeding. • Establish windbreak fences It is also relevant to assess whether there is a need for further measures in the upper part of the sand deposit site. If applicable, this will be carried out with hourly rates in the contract. The measures shall also take into account: • Outdoor activities • Cultural heritage sites • Natural environment The Norwegian Environment Agency is the landowner of the sand deposit area at Knaben, and invites, in cooperation with Kvinesdal municipality, to a competition for securing and covering sand disposal sites at Knaben. The Norwegian Environment Agency is the contracting authority and Kvinesdal municipality will be responsible for local follow-up of the contract with the presence of a project manager. The engineering design services were carried out by Asplan Viak together with NIBIO, on behalf of the Norwegian Environment Agency in 2025.
The sand deposit site (Knabensanden) at the disused Knaben molybdenum mines causes drainage of finely grained tailings (sand and silt) to the watercourse below. The purpose of the assignment is to carry out permanent measures that prevent this run-off. The molybdenum mines were closed down in 1973 and have left a disposal site. The tailings is the "worthless part" of the ore and consists of fine mineral particles. The sand deposit site covers an area of approx. 300 decares and has a thickness of up to 20 m. Stabilisation work has previously been carried out in connection with the sand deposit, in the early 2000s and in 2011-2012. There are both windblown sand and erosion that lead sand from the deposit site, to waterways downstream of the site, first and foremost to Store Knabetjønn. Asplan Viak has, on behalf of the Norwegian Environment Agency, prepared a plan with drawings and description of the measures to be carried out. Planned measures shall: • Empty sediment traps in Store Knabetjønn • Clean up established drainage channels around the sand deposit site, in order to manage surface water outside the site. • Transport the matter from the points above to the deposit site and lay out at the designated place at the site. • Stabilise the matter at the sand deposit site with the help of gravel and top-soil. Growth soil shall form the basis for a later procurement for planting and seeding. • Establish windbreak fences It is also relevant to assess whether there is a need for further measures in the upper part of the sand deposit site. If applicable, this will be carried out with hourly rates in the contract. The measures shall also take into account: • Outdoor activities • Cultural heritage sites • Natural environment The Norwegian Environment Agency is the landowner of the sand deposit area at Knaben, and invites, in cooperation with Kvinesdal municipality, to a competition for securing and covering sand disposal sites at Knaben. The Norwegian Environment Agency is