Public Toilet Refurbishment
Comprador: Winchcombe Town Council
£ 100.000
Aberta
Prazo de apresentação: 20 de jan. de 2027, 12:00 UTC
| Situação | Adjudicada |
|---|---|
| Valor estimado | £ 213.580,59 |
| Prazo de apresentação | Prazo não publicado |
| Publicado | 25 de nov. de 2026 |
| Comprador | University of Sunderland |
| País | Reino Unido · Sunderland |
| Código CPV | 45453100 |
| Fonte | Find a Tender ↗ |
Este aviso não está mais aberto para propostas. O original continua disponível para consulta.
| Fornecedor vencedor | Número de registro / LEI | País | Valor adjudicado do contrato | Data de adjudicação |
|---|---|---|---|---|
| Vest Construction (LIVECO) Ltd Bishop Auckland | GB-COH: 05286542 | Reino Unido | £ 213.580,59 | 10 de ago. de 2026 |
Comprador: Winchcombe Town Council
£ 100.000
Aberta
Prazo de apresentação: 20 de jan. de 2027, 12:00 UTC
Comprador: VIA EAST MIDLANDS LIMITED
£ 20.000.000
Aberta
Prazo de apresentação: 15 de jan. de 2027, 11:00 UTC
Comprador: Forestry Commission
£ 150.000
Aberta
Prazo de apresentação: 5 de jan. de 2027, 12:00 UTC
Comprador: Bristol City Council
£ 60.000
Aberta
Prazo de apresentação: 24 de dez. de 2026, 12:00 UTC
Verificado:
O aviso oficial prevalece. Sua situação e condições podem mudar após a coleta.
The project will deliver a comprehensive refurbishment of the male and female changing areas, team changing rooms, shower facilities and associated WCs. Works include replacement of flooring, ceilings, lighting, sanitaryware, shower installations, cubicles, vanity units, locker doors and hand dryers, alongside full redecoration and upgrades to changing room furnishings. The scope also extends to the refurbishment of two assisted shower rooms and an assisted WC adjacent to the main changing areas.
Cityspace male and female changing spaces which include the WC's, shower facilities and changing spaces, also incorporating the home and away teams changing spaces. The works will consist of the replacement of all flooring, suspended ceilings, lighting, full redecoration, WC cubicles, WC wash hand basins, toilet pans and urinals, shower units, installation of new shower cubicles, installation of new vanity units, which will include large mirrors, fixed hair dryers, and power sockets for electric beauty products, new locker doors, a refresh of the changing room benches, new electric hand driers and full length mirrors.
Works also included within the City Space works is the replacement of floor finishes and redecoration to the two assisted shower rooms and the assisted WC within the corridor outside of the main changing rooms.