Public Toilet Refurbishment
Comprador: Winchcombe Town Council
£ 100.000
Aberta
Prazo de apresentação: 20 de jan. de 2027, 12:00 UTC
| Situação | Adjudicada |
|---|---|
| Valor estimado | £ 4.166.667 |
| Prazo de apresentação | Prazo não publicado |
| Publicado | 24 de nov. de 2026 |
| Comprador | Harlow Council |
| País | Reino Unido · Harlow |
| Código CPV | 45000000 |
| Fonte | Find a Tender ↗ |
Este aviso não está mais aberto para propostas. O original continua disponível para consulta.
| Fornecedor vencedor | Número de registro / LEI | País | Valor adjudicado do contrato | Data de adjudicação |
|---|---|---|---|---|
| Infinity Fire Prevention Rochester | GB-COH: 08320320 | Reino Unido | £ 4.166.667 | 24 de nov. de 2026 |
| Bell Group Limited Airdrie | GB-COH: SC0114142 | Reino Unido | £ 4.166.167 | 24 de nov. de 2026 |
| Sureserve Compliance Fire Basildon | GB-COH: 02504054 | Reino Unido | £ 4.166.667 | 24 de nov. de 2026 |
Comprador: Winchcombe Town Council
£ 100.000
Aberta
Prazo de apresentação: 20 de jan. de 2027, 12:00 UTC
Comprador: VIA EAST MIDLANDS LIMITED
£ 20.000.000
Aberta
Prazo de apresentação: 15 de jan. de 2027, 11:00 UTC
Comprador: Forestry Commission
£ 150.000
Aberta
Prazo de apresentação: 5 de jan. de 2027, 12:00 UTC
Comprador: Bristol City Council
£ 60.000
Aberta
Prazo de apresentação: 24 de dez. de 2026, 12:00 UTC
Verificado:
O aviso oficial prevalece. Sua situação e condições podem mudar após a coleta.
he Works comprise outstanding and emerging FRA remedial actions and directly associated or consequential fire-safety works. The scope includes passive fire protection and compartmentation, including loft and roof-void compartmentation; fire stopping and cavity barriers; fire doors, door sets, door components, fire-rated glazing and access panels; active fire-protection systems where instructed; intrusive verification, surveys, inspections and testing necessary to define or complete remedial work; associated builders work, making good, access and temporary works; and other work expressly identified in an Order that is directly connected to a fire-safety requirement.
he Works comprise outstanding and emerging FRA remedial actions and directly associated or consequential fire-safety works. The scope includes passive fire protection and compartmentation, including loft and roof-void compartmentation; fire stopping and cavity barriers; fire doors, door sets, door components, fire-rated glazing and access panels; active fire-protection systems where instructed; intrusive verification, surveys, inspections and testing necessary to define or complete remedial work; associated builders work, making good, access and temporary works; and other work expressly identified in an Order that is directly connected to a fire-safety requirement.