GB-Bootle: Stanley Road, Bootle - Roof Terrace Refurbishment Works
Comprador: Plus Dane Housing Ltd.
£ 500.000
Aberta
Prazo de apresentação: 15 de dez. de 2026, 12:00 UTC
| Situação | Aberta |
|---|---|
| Valor estimado | £ 24.100.000 |
| Prazo de apresentação | 18 de dez. de 2026, 12:00 UTC |
| Publicado | 18 de nov. de 2026 |
| Comprador | Metropolitan borough of Bury |
| País | Reino Unido · Bury |
| Código CPV | 45000000 |
| Fonte | Find a Tender ↗ |
Verificado:
O aviso oficial prevalece. Sua situação e condições podem mudar após a coleta.
Mill Gate transformation is a catalyst
project that will reposition the shopping centre and its
surroundings as a more connected, attractive and commercially
resilient town-centre destination. Building on the aspirations of
the Mill Gate Regeneration Framework, the proposals focus on
opening up the existing mall environment, creating new public
spaces, improving pedestrian connectivity and establishing
development-ready plots for future phases of regeneration.
The works are centred around three key areas: The Square,
Minden & Market Parade and Union Square. Collectively, they
involve selective demolition, public realm reconstruction,
alterations to existing buildings and canopies, refurbishment of
retained frontages, servicing and highways modifications,
landscaping, lighting, drainage and infrastructure works. The
objective is not simply to improve the physical environment, but
to reconnect Mill Gate with Bury Market, the Interchange, The
Rock and surrounding town-centre destinations whilst
supporting future mixed-use regeneration.
Contractors should anticipate a complex town-centre
regeneration project delivered within a live trading environment,
requiring careful phasing, stakeholder coordination,
maintenance of pedestrian access and ongoing operation of
businesses, markets and servicing functions throughout the
construction period.
£ 24.100.000