Ionad Eilean nan Òige - Phase 3

Fatos principais (Key Facts)

SituaçãoAberta
Valor estimado£ 3.000.000
Prazo de apresentação16 de dez. de 2026, 12:00 UTC
Publicado16 de nov. de 2026
CompradorComann Eachdraidh Eirisgeidh
PaísReino Unido · Outer Hebrides
Código CPV45000000
FonteFind a Tender ↗
Abrir aviso oficial
Situação
Aberta
Valor estimado
£ 3.000.000
Prazo de apresentação
16 de dez. de 2026, 12:00 UTC
Publicado
16 de nov. de 2026
Comprador
Comann Eachdraidh Eirisgeidh
País
Reino Unido
Código CPV
45000000
Fonte
Find a Tender

Verificado:

O aviso oficial prevalece. Sua situação e condições podem mudar após a coleta.

Descrição

This document contains the Stage 1 Tender for the Community Hub project Ionad Eilean
Na Òige.
1.2 Tender design information is currently being prepared by the appointed design team and is
expected to be completed by early 2027. Comann Eachdraidh Eirisgeidh are looking to
appoint a suitably qualified and experienced contractor on a first stage tender who will
then work with the team to finalise the price, scope of works and programme before being
appointed to carry out the works.
1.3 The first stage will comprise finalising design, programme, cost and contract conditions.
The appointed contractor will require to work collaboratively with the team during this
stage to ensure value for money is achieved.
1.4 The target for entering into contract is end of March 2027 with a site start shortly
thereafter.
Refer to documentation provided for full details.

Lotes

  1. 1

    Tender design information is currently being prepared by the appointed design team and is
    expected to be completed by early 2027. Comann Eachdraidh Eirisgeidh are looking to
    appoint a suitably qualified and experienced contractor on a first stage tender who will
    then work with the team to finalise the price, scope of works and programme before being
    appointed to carry out the works.
    1.3 The first stage will comprise finalising design, programme, cost and contract conditions.
    The appointed contractor will require to work collaboratively with the team during this
    stage to ensure value for money is achieved.
    1.4 The target for entering into contract is end of March 2027 with a site start shortly
    thereafter.

    £ 3.000.000

Contatos profissionais públicos

Sandra MacInnes

sandra@eriskayheritage.scot

+44 1878720713

Verificado: