Find a Tender · 108614-2026

Relocation of 132kV UKPN Cut Throat Lane Switching Station

Fatos principais (Key Facts)

SituaçãoAdjudicada
Valor estimado£ 22.076.599,33
Prazo de apresentaçãoPrazo não publicado
Publicado16 de nov. de 2026
CompradorEast West Rail Company Limited
PaísReino Unido · MILTON KEYNES
Código CPV31321000, 31200000, 31321100, 65300000, 65000000, 45000000, 45100000
FonteFind a Tender ↗
Abrir aviso oficial

Competição e histórico do comprador

Ver comprador →
Avisos coletados30 aberta
Contratos confirmados3Principais vencedores: UK Power Networks Operations Ltd

Resultado da adjudicação e licitações abertas

Este aviso não está mais aberto para propostas. O original continua disponível para consulta.

Fornecedor vencedorNúmero de registro / LEIPaísValor adjudicado do contratoData de adjudicação
UK Power Networks Operations Ltd
Newington House, 237 Southwark Bridge Road, London, SE1 6NP
ConnectionAcceptance@ukpowernetworks.co.uk
GB-COH: 03870728Reino Unido£ 22.076.599,3316 de nov. de 2026

Licitações abertas neste CPV (CPV 31000000 · Matriz CPV × país)

Verificar limiares, prazos e referências

Verificado:

O aviso oficial prevalece. Sua situação e condições podem mudar após a coleta.

Descrição

East West Rail Co. (The Authority) is delivering the East West Rail programme, a nationally significant infrastructure project providing new and upgraded rail connections between Oxford, Milton Keynes, Bedford and Cambridge.
As part of the delivery of the proposed six-track railway corridor north of Bedford, the railway infrastructure interfaces with existing 132kV electricity distribution assets owned and operated by UK Power Networks Operations Ltd at the Fairfield Park / Cut Throat Lane Switching Station north of Bedford. The existing switching station lies within the footprint of the proposed railway works and must be relocated to enable construction of the railway.
The contract comprises the design, decommissioning, relocation, installation, testing and commissioning of a replacement 132kV switching station, together with all associated electrical, civil and enabling works required to maintain network resilience and continuity of supply, and to facilitate the transfer of services from the existing installation to the replacement facility.
The requirement comprises non-contestable electricity network works that may only be undertaken by the licensed Distribution Network Operator in accordance with the statutory framework established under the Electricity Act 1989 (as amended). As the owner, operator and licensed Distribution Network Operator for the affected network assets, UK Power Networks Operations Ltd is the only organisation with the legal authority and technical responsibility to undertake the required works.
Accordingly, competition is absent for technical and exclusive rights reasons. The Authority therefore intends to award the contract directly to UK Power Networks Operations Ltd. The Authority considers that the conditions for a direct award under Schedule 5, Paragraph 5 (a) and (b) of the Procurement Act 2023 are satisfied, as the works can only be supplied by a particular supplier due to the absence of competition arising from exclusive rights.