Refurbishment of Craigton Point Light
Comprador: Northern Lighthouse Board
£ 40.000
Aberta
Prazo de apresentação: 15 de jan. de 2027, 14:00 UTC
| Situação | Adjudicada |
|---|---|
| Valor estimado | £ 511.109 |
| Prazo de apresentação | Prazo não publicado |
| Publicado | 13 de nov. de 2026 |
| Comprador | Northern Lighthouse Board |
| País | Reino Unido · Edinburgh |
| Código CPV | 45244000, 50246100, 63726500 |
| Fonte | Find a Tender ↗ |
Este aviso não está mais aberto para propostas. O original continua disponível para consulta.
| Fornecedor vencedor | Número de registro / LEI | País | Valor adjudicado do contrato | Data de adjudicação |
|---|---|---|---|---|
| UK Docks Marine Services Teeside Ltd River Drive, South Shields, NE33 1LH teesside@ukdocks.com | GB-COH: 07585952 | Reino Unido | £ 511.109 | 13 de nov. de 2026 |
Comprador: Northern Lighthouse Board
£ 40.000
Aberta
Prazo de apresentação: 15 de jan. de 2027, 14:00 UTC
Comprador: Northern Lighthouse Board
£ 1.900.000
Aberta
Prazo de apresentação: 15 de jan. de 2027, 14:00 UTC
Comprador: Winchcombe Town Council
£ 100.000
Aberta
Prazo de apresentação: 20 de jan. de 2027, 12:00 UTC
Comprador: VIA EAST MIDLANDS LIMITED
£ 20.000.000
Aberta
Prazo de apresentação: 15 de jan. de 2027, 11:00 UTC
Comprador: Forestry Commission
£ 150.000
Aberta
Prazo de apresentação: 5 de jan. de 2027, 12:00 UTC
Comprador: Bristol City Council
£ 60.000
Aberta
Prazo de apresentação: 24 de dez. de 2026, 12:00 UTC
Verificado:
O aviso oficial prevalece. Sua situação e condições podem mudar após a coleta.
The Northern Lighthouse Board (NLB) require Dry Dock Facilities for NLV Pharos to carry out 20 year Special survey works This will include essential works and surveys to meet the Classification Society/Flag state requirements for certification of the vessel. Total estimated timescales for the duration required for the works are 4 weeks, with dry dock works being 3 weeks within this. The services will be provided by both the dry dock facility and external contractors, access will be required for NLB staff and NLB prearranged appointed contractors. Locations within the United Kingdom and Europe will be considered.
Estimated dates for Dry Dock:
Arrival Date - 28th January 2027 Layby berth
Dry dock works - 1st February - 23rd February 2027 (layby berth)
Departure Date: 28th February 2027
Potential suppliers should provide dates that their drydock is available, noting the approximately 4 week required duration for the works. These are the preferred dates but may be flexible to meet drydock availability.
Our documents are now live for this tender and we are looking for suppliers who can provide a Dry Dock location and works, that meet the requirements of NLB. A brief outline is below:
NLV Pharos 20 year special survey drydock
- Tank/Hull inspection/survey
- Ship side valves overhaul/survey
- All safety equipment/systems major overhaul/survey
Class society: Lloyds Register
Full Hull painting
Thruster overhauls (completed by OEM)
Electrical Healthcare
Miscellaneous works including:
- ER supply fan overhaul
- Helideck equipment maintenance
- Mooring equipment maintenance
Full documents can be found within Delta, https://nlb.delta-esourcing.com/delta/buyers/select/viewListStatus.html?id=1050884359
Ship Details
IMO Number - 9338606
Length Overall - 84.25metres
Breadth Moulded - 16.49 metres
Gross Tonnage – 3672T
Dry dock blocks - Minimum of 1.5m blocks for ease of access under the vessel.