Feasibility Study & Detail Designs of 8 (Eight ) Water Supply & Sanitation schemes from existing Boreholes .
Comprador: Afar Region RPCU
Valor não publicado
Aberta
Prazo de apresentação: 20 de nov. de 2026
Este aviso não está mais aberto para propostas. O original continua disponível para consulta.
Verificado:
O aviso oficial prevalece. Sua situação e condições podem mudar após a coleta.
The provision, installation, and configuration of a modern, secure, and scalable network infrastructure, in order to meet the DfE's required Wireless Network Standards.
The solution will include:
• Supply and installation of new network switches in comms cabinets where required.
• Supply and installation of new wireless access points.
• Supply and installation of new Cat6A cable runs from the appropriate comms cabinet to each new access point.
• Fibre backbone upgrades.
• 20Gb uplinks between core and edge switches
• Decommissioning of legacy wireless infrastructure.
Comprador: Afar Region RPCU
Valor não publicado
Aberta
Prazo de apresentação: 20 de nov. de 2026
Comprador: Cross River State SPIN
Valor não publicado
Aberta
Prazo de apresentação: 30 de nov. de 2026
Comprador: Project Management Unit, School Education Department, Government of Balochistan
Valor não publicado
Aberta
Prazo de apresentação: 23 de nov. de 2026
Comprador: Project Management Unit, School Education Department, Government of Balochistan
Valor não publicado
Aberta
Prazo de apresentação: 24 de nov. de 2026
Comprador: Amhara Urban Development and Infrastructure Bureau
Valor não publicado
Aberta
Prazo de apresentação: 18 de nov. de 2026