SprosRadar
Buscar licitações
UK Contracts Finder · b757684a-1e7c-4d09-9389-1b91fb4c14f5-921130

Coalsnaughton Support Technical Review

Fatos principais (Key Facts)

SituaçãoAdjudicada
Valor estimado£ 299.900
Prazo de apresentação30 de out. de 2026, 12:00 UTC
Publicado10 de nov. de 2026
CompradorMINING REMEDIATION AUTHORITY
PaísReino Unido · MANSFIELD
Código CPV71530000
FonteUK Contracts Finder ↗
Abrir aviso oficial

Competição e histórico do comprador

Ver comprador →
Avisos coletados70 aberta
Contratos confirmados7Principais vencedores: BALFOUR BEATTY CIVILS LIMITED

Resultado da adjudicação e licitações abertas

Este aviso não está mais aberto para propostas. O original continua disponível para consulta.

Fornecedor vencedorNúmero de registro / LEIPaísValor adjudicado do contratoData de adjudicação
Slr Consulting Ltd
Brockhill Court, B97 6RB
GB-COH: 03880506Reino Unido£ 299.90030 de out. de 2026

Licitações abertas neste CPV (CPV 71000000 · Matriz CPV × país)

Verificar limiares, prazos e referências

Verificado:

O aviso oficial prevalece. Sua situação e condições podem mudar após a coleta.

Descrição

This notice is intended to inform that a call off from a Framework has taken place.

The Coalsnaughton Incident requires multidisciplinary engineering input across structural, geotechnical, mining and geological matters. WSP is undertaking significant elements of the technical work and engineering development for Phase 2 under separate commissions approved through the MRA Engineering Services Framework.

It is considered appropriate for the MRA to obtain independent technical assurance of key elements of this work. The appointment of SLR provides additional specialist challenge and advice to support the MRA in understanding the technical evidence presented, identifying material gaps or concerns and making informed decisions as the project progresses.

The scope includes:

• review of structural inspection reports relating to properties identified for demolition;
• technical review of proposed protection and demolition works;
• review and interpretation of available site characterisation information;
• engagement with BGS;
• review of relevant WSP technical information and deliverables;
• participation in technical and project meetings; and
• ongoing multidisciplinary technical advice.

The commission is deliberately structured as an assurance and advisory role. SLR will not replace the responsibilities of WSP or other designers and consultants, nor will they make decisions on behalf of the MRA.

Contatos profissionais públicos

Roger Martin

roger.martin@miningremediation.gov.uk

01623637400

Verificado: