TR2285 ESB Moneypoint FGD (LOT 1) and Batching Plant (LOT 2) Ash Injection Systems

Datos clave (Key Facts)

EstadoAdjudicada
Importe estimadoImporte no publicado
Plazo de presentaciónPlazo no publicado
Publicado13 nov 2026
CompradorElectricity Supply Board ( ESB )
PaísIrlanda · Dublin
Código CPV42417200, 42417210, 51511200
FuenteTenders Electronic Daily (TED) ↗
Abrir anuncio oficial
Estado
Adjudicada
Importe estimado
Importe no publicado
Plazo de presentación
Plazo no publicado
Publicado
13 nov 2026
Comprador
Electricity Supply Board ( ESB )
País
Irlanda
Código CPV
42417200, 42417210, 51511200
Fuente
Tenders Electronic Daily (TED)

Resultado de adjudicación y licitaciones abiertas

Este anuncio ya no admite ofertas. El original sigue disponible como referencia.

Adjudicatario / ganadorNúmero de registro / LEIPaísImporte adjudicadoFecha de adjudicación
Caltech srl
via vincenzo bellini 41/c, Via Vincenzo Bellini 41/C -84090, Montecorvino Pugliano (SA) - Italy
luigi.colucci@cal-tech.it
IT-REG: 05762170651ItaliaImporte no publicado31 jul 2026

Licitaciones abiertas en este CPV (CPV 42000000 · Matriz CPV × país)

Tenders Electronic Daily (TED) · Polonia

Poland – Lifting and handling equipment and parts – Dostawa urządzenia technologicznego do montażu i demontażu ciągów pompowych wraz z wyposażeniem pomocniczym dla Spółki Restrukturyzacji Kopalń S.A. Oddział Centralny Zakład Odwadniania Kopalń Część I – Dostawa urządzenia technologicznego do montażu i demontażu ciągów pompowych Część II – Dostawa bębnów kablowych z napędem elektrycznym.

Comprador: Spółka Restrukturyzacji Kopalń S.A.

Importe no publicado

Abierta

Plazo de presentación: 27 nov 2026, 07:00 UTC

CPV: 42400000 · 44619200 · 42420000 · 42924740

Comprobado:

Prevalece el anuncio oficial. Su estado y condiciones pueden cambiar después de la recopilación.

Descripción

The Contracting Entity intends to procure a contract for the design, manufacture, installation (Option) and commissioning of 3 x FGD ash injection (LOT 1) and/or 1 x batching plant ash injection systems (LOT 2). ESB as the contracting entity, will be responsible for reclaiming the ash from the ASA and locating it into newly designed and constructed ash unloading facility, at the base of the planned injection systems. It is proposed that the Contract will include the design, manufacture, Installation (Option) and commissioning of 3 x FGD (LOT 1) and 1 x batching plant (LOT 2) ash injection systems. The proposed systems will be capable of elevation and subsequent injection of ash, with the stated properties, to the 3 x unit FGD’s at elevations of circa 17.5m injection point and Batching plant at circa 14.5m injection point. The required feed rates capabilities of the new systems are ash feed in rates to each unit FGD of approx. 3 to 5 tonne/hour and the Batching plant at a rate of approx. 30 to 50 tonne/hour.

Lotes

  1. LOT 1

    The Contracting Entity intends to procure a contract for the design, manufacture, installation (Option) and commissioning of 3 x FGD ash injection (LOT 1) and/or 1 x batching plant ash injection systems (LOT 2). ESB as the contracting entity, will be responsible for reclaiming the ash from the ASA and locating it into newly designed and constructed ash unloading facility, at the base of the planned injection systems. It is proposed that the Contract will include the design, manufacture, Installation (Option) and commissioning of 3 x FGD (LOT 1) and 1 x batching plant (LOT 2) ash injection systems. The proposed systems will be capable of elevation and subsequent injection of ash, with the stated properties, to the 3 x unit FGD’s at elevations of circa 17.5m injection point and Batching plant at circa 14.5m injection point. The required feed rates capabilities of the new systems are ash feed in rates to each unit FGD of approx. 3 to 5 tonne/hour and the Batching plant at a rate of approx. 30 to 50 tonne/hour.

  2. LOT 2

    The Contracting Entity intends to procure a contract for the design, manufacture, installation (Option) and commissioning of 3 x FGD ash injection (LOT 1) and/or 1 x batching plant ash injection systems (LOT 2). ESB as the contracting entity, will be responsible for reclaiming the ash from the ASA and locating it into newly designed and constructed ash unloading facility, at the base of the planned injection systems. It is proposed that the Contract will include the design, manufacture, Installation (Option) and commissioning of 3 x FGD (LOT 1) and 1 x batching plant (LOT 2) ash injection systems. The proposed systems will be capable of elevation and subsequent injection of ash, with the stated properties, to the 3 x unit FGD’s at elevations of circa 17.5m injection point and Batching plant at circa 14.5m injection point. The required feed rates capabilities of the new systems are ash feed in rates to each unit FGD of approx. 3 to 5 tonne/hour and the Batching plant at a rate of approx. 30 to 50 tonne/hour.