Public Toilet Refurbishment
Comprador: Winchcombe Town Council
100.000 GBP
Abierta
Plazo de presentación: 20 ene 2027, 12:00 UTC
| Estado | Adjudicada |
|---|---|
| Importe estimado | 213.580,59 GBP |
| Plazo de presentación | Plazo no publicado |
| Publicado | 25 nov 2026 |
| Comprador | University of Sunderland |
| País | Reino Unido · Sunderland |
| Código CPV | 45453100 |
| Fuente | Find a Tender ↗ |
Este anuncio ya no admite ofertas. El original sigue disponible como referencia.
| Adjudicatario / ganador | Número de registro / LEI | País | Importe adjudicado | Fecha de adjudicación |
|---|---|---|---|---|
| Vest Construction (LIVECO) Ltd Bishop Auckland | GB-COH: 05286542 | Reino Unido | 213.580,59 GBP | 10 ago 2026 |
Comprador: Winchcombe Town Council
100.000 GBP
Abierta
Plazo de presentación: 20 ene 2027, 12:00 UTC
Comprador: VIA EAST MIDLANDS LIMITED
20.000.000 GBP
Abierta
Plazo de presentación: 15 ene 2027, 11:00 UTC
Comprador: Forestry Commission
150.000 GBP
Abierta
Plazo de presentación: 5 ene 2027, 12:00 UTC
Comprador: Bristol City Council
60.000 GBP
Abierta
Plazo de presentación: 24 dic 2026, 12:00 UTC
Comprobado:
Prevalece el anuncio oficial. Su estado y condiciones pueden cambiar después de la recopilación.
The project will deliver a comprehensive refurbishment of the male and female changing areas, team changing rooms, shower facilities and associated WCs. Works include replacement of flooring, ceilings, lighting, sanitaryware, shower installations, cubicles, vanity units, locker doors and hand dryers, alongside full redecoration and upgrades to changing room furnishings. The scope also extends to the refurbishment of two assisted shower rooms and an assisted WC adjacent to the main changing areas.
Cityspace male and female changing spaces which include the WC's, shower facilities and changing spaces, also incorporating the home and away teams changing spaces. The works will consist of the replacement of all flooring, suspended ceilings, lighting, full redecoration, WC cubicles, WC wash hand basins, toilet pans and urinals, shower units, installation of new shower cubicles, installation of new vanity units, which will include large mirrors, fixed hair dryers, and power sockets for electric beauty products, new locker doors, a refresh of the changing room benches, new electric hand driers and full length mirrors.
Works also included within the City Space works is the replacement of floor finishes and redecoration to the two assisted shower rooms and the assisted WC within the corridor outside of the main changing rooms.