Public Toilet Refurbishment
Comprador: Winchcombe Town Council
100.000 GBP
Abierta
Plazo de presentación: 20 ene 2027, 12:00 UTC
| Estado | Adjudicada |
|---|---|
| Importe estimado | 190.255,02 GBP |
| Plazo de presentación | Plazo no publicado |
| Publicado | 24 nov 2026 |
| Comprador | Stonewater |
| País | Reino Unido · London |
| Código CPV | 45000000 |
| Fuente | Find a Tender ↗ |
Este anuncio ya no admite ofertas. El original sigue disponible como referencia.
| Adjudicatario / ganador | Número de registro / LEI | País | Importe adjudicado | Fecha de adjudicación |
|---|---|---|---|---|
| Lawtech Group Ltd Rochester | GB-COH: 05301280 | Reino Unido | 190.255,02 GBP | 12 nov 2026 |
Comprador: Winchcombe Town Council
100.000 GBP
Abierta
Plazo de presentación: 20 ene 2027, 12:00 UTC
Comprador: VIA EAST MIDLANDS LIMITED
20.000.000 GBP
Abierta
Plazo de presentación: 15 ene 2027, 11:00 UTC
Comprador: Forestry Commission
150.000 GBP
Abierta
Plazo de presentación: 5 ene 2027, 12:00 UTC
Comprador: Bristol City Council
60.000 GBP
Abierta
Plazo de presentación: 24 dic 2026, 12:00 UTC
Comprobado:
Prevalece el anuncio oficial. Su estado y condiciones pueden cambiar después de la recopilación.
the PCSA will support the development and coordination of fire safety remediation works to two higher-risk residential buildings, including replacement of internal fire doors, upgraded in-flat fire detection, comprehensive fire stopping, new sprinkler systems, compliant signage, and associated enabling works. Common areas will be refurbished, ceilings replaced where required, and services rationalised. Building-specific works include lift refurbishment, balcony and terrace door repla
In summary, the PCSA will support the development and coordination of fire safety remediation works to two higher-risk residential buildings, including replacement of internal fire doors, upgraded in-flat fire detection, comprehensive fire stopping, new sprinkler systems, compliant signage, and associated enabling works. Common areas will be refurbished, ceilings replaced where required, and services rationalised. Building-specific works include lift refurbishment, balcony and terrace door