Public Toilet Refurbishment
Comprador: Winchcombe Town Council
100.000 GBP
Abierta
Plazo de presentación: 20 ene 2027, 12:00 UTC
| Estado | Adjudicada |
|---|---|
| Importe estimado | 4.166.667 GBP |
| Plazo de presentación | Plazo no publicado |
| Publicado | 24 nov 2026 |
| Comprador | Harlow Council |
| País | Reino Unido · Harlow |
| Código CPV | 45000000 |
| Fuente | Find a Tender ↗ |
Este anuncio ya no admite ofertas. El original sigue disponible como referencia.
| Adjudicatario / ganador | Número de registro / LEI | País | Importe adjudicado | Fecha de adjudicación |
|---|---|---|---|---|
| Infinity Fire Prevention Rochester | GB-COH: 08320320 | Reino Unido | 4.166.667 GBP | 24 nov 2026 |
| Bell Group Limited Airdrie | GB-COH: SC0114142 | Reino Unido | 4.166.167 GBP | 24 nov 2026 |
| Sureserve Compliance Fire Basildon | GB-COH: 02504054 | Reino Unido | 4.166.667 GBP | 24 nov 2026 |
Comprador: Winchcombe Town Council
100.000 GBP
Abierta
Plazo de presentación: 20 ene 2027, 12:00 UTC
Comprador: VIA EAST MIDLANDS LIMITED
20.000.000 GBP
Abierta
Plazo de presentación: 15 ene 2027, 11:00 UTC
Comprador: Forestry Commission
150.000 GBP
Abierta
Plazo de presentación: 5 ene 2027, 12:00 UTC
Comprador: Bristol City Council
60.000 GBP
Abierta
Plazo de presentación: 24 dic 2026, 12:00 UTC
Comprobado:
Prevalece el anuncio oficial. Su estado y condiciones pueden cambiar después de la recopilación.
he Works comprise outstanding and emerging FRA remedial actions and directly associated or consequential fire-safety works. The scope includes passive fire protection and compartmentation, including loft and roof-void compartmentation; fire stopping and cavity barriers; fire doors, door sets, door components, fire-rated glazing and access panels; active fire-protection systems where instructed; intrusive verification, surveys, inspections and testing necessary to define or complete remedial work; associated builders work, making good, access and temporary works; and other work expressly identified in an Order that is directly connected to a fire-safety requirement.
he Works comprise outstanding and emerging FRA remedial actions and directly associated or consequential fire-safety works. The scope includes passive fire protection and compartmentation, including loft and roof-void compartmentation; fire stopping and cavity barriers; fire doors, door sets, door components, fire-rated glazing and access panels; active fire-protection systems where instructed; intrusive verification, surveys, inspections and testing necessary to define or complete remedial work; associated builders work, making good, access and temporary works; and other work expressly identified in an Order that is directly connected to a fire-safety requirement.