Sir Roger Manwood's School - Grange Sixth Form refurbishment
Comprador: SIR ROGER MANWOOD'S SCHOOL
1.550.000 GBP
Abierta
Plazo de presentación: 13 dic 2026, 23:59 UTC
| Estado | Abierta |
|---|---|
| Importe estimado | 3.000.000 GBP |
| Plazo de presentación | 16 dic 2026, 12:00 UTC |
| Publicado | 16 nov 2026 |
| Comprador | Comann Eachdraidh Eirisgeidh |
| País | Reino Unido · Outer Hebrides |
| Código CPV | 45000000 |
| Fuente | Find a Tender ↗ |
Comprobado:
Prevalece el anuncio oficial. Su estado y condiciones pueden cambiar después de la recopilación.
This document contains the Stage 1 Tender for the Community Hub project Ionad Eilean
Na Òige.
1.2 Tender design information is currently being prepared by the appointed design team and is
expected to be completed by early 2027. Comann Eachdraidh Eirisgeidh are looking to
appoint a suitably qualified and experienced contractor on a first stage tender who will
then work with the team to finalise the price, scope of works and programme before being
appointed to carry out the works.
1.3 The first stage will comprise finalising design, programme, cost and contract conditions.
The appointed contractor will require to work collaboratively with the team during this
stage to ensure value for money is achieved.
1.4 The target for entering into contract is end of March 2027 with a site start shortly
thereafter.
Refer to documentation provided for full details.
Tender design information is currently being prepared by the appointed design team and is
expected to be completed by early 2027. Comann Eachdraidh Eirisgeidh are looking to
appoint a suitably qualified and experienced contractor on a first stage tender who will
then work with the team to finalise the price, scope of works and programme before being
appointed to carry out the works.
1.3 The first stage will comprise finalising design, programme, cost and contract conditions.
The appointed contractor will require to work collaboratively with the team during this
stage to ensure value for money is achieved.
1.4 The target for entering into contract is end of March 2027 with a site start shortly
thereafter.
3.000.000 GBP