SprosRadar
Buscar licitaciones
Find a Tender · 108639-2026

Ionad Eilean nan Òige - Phase 3

Datos clave (Key Facts)

EstadoAbierta
Importe estimado3.000.000 GBP
Plazo de presentación16 dic 2026, 12:00 UTC
Publicado16 nov 2026
CompradorComann Eachdraidh Eirisgeidh
PaísReino Unido · Outer Hebrides
Código CPV45000000
FuenteFind a Tender ↗
Abrir anuncio oficial
Estado
Abierta
Importe estimado
3.000.000 GBP
Plazo de presentación
16 dic 2026, 12:00 UTC
Publicado
16 nov 2026
Comprador
Comann Eachdraidh Eirisgeidh
País
Reino Unido
Código CPV
45000000
Fuente
Find a Tender

Comprobado:

Prevalece el anuncio oficial. Su estado y condiciones pueden cambiar después de la recopilación.

Descripción

This document contains the Stage 1 Tender for the Community Hub project Ionad Eilean
Na Òige.
1.2 Tender design information is currently being prepared by the appointed design team and is
expected to be completed by early 2027. Comann Eachdraidh Eirisgeidh are looking to
appoint a suitably qualified and experienced contractor on a first stage tender who will
then work with the team to finalise the price, scope of works and programme before being
appointed to carry out the works.
1.3 The first stage will comprise finalising design, programme, cost and contract conditions.
The appointed contractor will require to work collaboratively with the team during this
stage to ensure value for money is achieved.
1.4 The target for entering into contract is end of March 2027 with a site start shortly
thereafter.
Refer to documentation provided for full details.

Lotes

  1. 1

    Tender design information is currently being prepared by the appointed design team and is
    expected to be completed by early 2027. Comann Eachdraidh Eirisgeidh are looking to
    appoint a suitably qualified and experienced contractor on a first stage tender who will
    then work with the team to finalise the price, scope of works and programme before being
    appointed to carry out the works.
    1.3 The first stage will comprise finalising design, programme, cost and contract conditions.
    The appointed contractor will require to work collaboratively with the team during this
    stage to ensure value for money is achieved.
    1.4 The target for entering into contract is end of March 2027 with a site start shortly
    thereafter.