Prevalece el anuncio oficial. Su estado y condiciones pueden cambiar después de la recopilación.
Descripción
The National Coal Mining Museum (NCMME) is looking to appoint a Conservation Architect-led team to survey historic buildings at Caphouse Colliery and scope/specify, in collaboration with the Client Team, a programme of prioritised conservation works and structural/other repairs to ensure their long-term integrity and physical survival. This to focus on the Screens Building and the Colliery Chimney and include targeted works to the adjacent former blacksmiths (Lamp Room) and Boiler House. This team to include Lead Architect, Structural Engineer and Quantity Surveyor. The exact scope of resulting works will be dependent on that scoping exercise, but the works budget, against which the professional services should be costed, is estimated to be around £270,000, which must be completed in Financial Year 2027-8. These works are supported by the UK government through the Public Bodies Infrastructure Fund. In terms of professional fees, tendered prices must include all stages through to completion of the works, including oversight of the works to be delivered, including quality assurance, adherence to specifications and QS services in terms of cost control and certification of works completed. This should include measured surveys of the buildings in question, where required to the level to enable works to be specified and quantified for the procurement of works, recognising that the complexities in internal levels, structures and machinery therein, will mean that this is not a comprehensive measured survey of all internal/external structures. This to include primarily the Screens Building and Caphouse Colliery Chimney. The likely scope of works to other buildings, i.e. the former Blacksmiths and Boiler House, are not expected to necessitate measured surveys and can likely be specified by annotated photographs/similar. Quotations should be split by RIBA Stages, with RIBA 3 be completed by end of Financial Year 2026-27, with the expectation that final specifications and scope to RIBA 4 will be completed at pace in Financial Year 2027-28, enabling us to go out to tender for the works in May 2027 in order that the works can be procured, delivered and completed within Financial Year 2027-8. The Client will provide procurement management services separate to this contract, but the appointed team will be expected to produce all specifications for the work, contract documentation and be involved in the procurement process, both with respect to quality evaluation and checking of submitted prices against the specification. Note, site visits are available during the tendering process and should be arranged by contacting john.tanner@ncm.org.uk.
Usamos cookies y analítica para comprender las visitas y mejorar el sitio. Los campos de formularios y las conversaciones se ocultan en las grabaciones de sesión. Preferencias de cookies